A tile spacer comprises a base (20) for engaging a bottom surface of tiles and a stem (30) projecting upwardly from the base. The stem comprises two oppositely facing surfaces and two projections (36, 38) extending in opposite directions from the surfaces so that the stem and the projections define a cross-shaped profile with corners for contacting corners of four tiles. At least one of the surfaces of the stem includes a recessed, i.e. set-back, area (44). The projections extend from the recessed areas. One or both projections can be removed from the stem by breaking the projection(s) so that the tile spacer can be used with four, three or two tiles depending on whether one or both projections is removed. The recessed areas confine any residual material of the projection(s) that is not removed when the projection(s) is broken at least substantially within the recessed area(s) and minimises or avoids altogether interference with laying tiles.
Un dispositif d'espacement de dalles comprend une base (20) pour venir en prise avec une surface inférieure de dalles et une tige (30) faisant saillie vers le haut à partir de la base. La tige comprend deux surfaces opposées et deux saillies (36, 38) s'étendant dans des directions opposées à partir des surfaces de telle sorte que la tige et les saillies définissent un profil en forme de croix avec des coins pour entrer en contact avec les coins de quatre dalles. Au moins une des surfaces de la tige comprend une zone de renfoncement, c'est-à-dire une zone évidée (44). Les saillies s'étendent à partir des zones évidées. Une ou les deux saillies peuvent être retirées de la tige par rupture de la ou des saillies, de telle sorte que le dispositif d'espacement de dalles peut être utilisé avec quatre, trois ou deux dalles en fonction du fait qu'une ou les deux saillies soient retirées ou non. Les zones évidées confinent tout matériau résiduel de la ou des projections qui n'est pas retiré lorsque la ou les projections sont rompues au moins sensiblement à l'intérieur de la ou des zones évidées, et minimise ou évite toute interférence avec la pose de dalles.
A tile spacer comprises a base (20) for engaging a bottom surface of tiles and a stem (30) projecting upwardly from the base. The stem comprises two oppositely facing surfaces and two projections (36, 38) extending in opposite directions from the surfaces so that the stem and the projections define a cross-shaped profile with corners for contacting corners of four tiles. At least one of the surfaces of the stem includes a recessed, i.e. set-back, area (44). The projections extend from the recessed areas. One or both projections can be removed from the stem by breaking the projection(s) so that the tile spacer can be used with four, three or two tiles depending on whether one or both projections is removed. The recessed areas confine any residual material of the projection(s) that is not removed when the projection(s) is broken at least substantially within the recessed area(s) and minimises or avoids altogether interference with laying tiles.
Un dispositif d'espacement de dalles comprend une base (20) pour venir en prise avec une surface inférieure de dalles et une tige (30) faisant saillie vers le haut à partir de la base. La tige comprend deux surfaces opposées et deux saillies (36, 38) s'étendant dans des directions opposées à partir des surfaces de telle sorte que la tige et les saillies définissent un profil en forme de croix avec des coins pour entrer en contact avec les coins de quatre dalles. Au moins une des surfaces de la tige comprend une zone de renfoncement, c'est-à-dire une zone évidée (44). Les saillies s'étendent à partir des zones évidées. Une ou les deux saillies peuvent être retirées de la tige par rupture de la ou des saillies, de telle sorte que le dispositif d'espacement de dalles peut être utilisé avec quatre, trois ou deux dalles en fonction du fait qu'une ou les deux saillies soient retirées ou non. Les zones évidées confinent tout matériau résiduel de la ou des projections qui n'est pas retiré lorsque la ou les projections sont rompues au moins sensiblement à l'intérieur de la ou des zones évidées, et minimise ou évite toute interférence avec la pose de dalles.
TILE SPACER
DISPOSITIF D'ESPACEMENT DE DALLES
NUDO ENZO (Autor:in)
18.04.2019
Patent
Elektronische Ressource
Englisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden