METHOD FOR BUILDING A NEW BALLASTWAY FOR A RAIL LINE
The present invention relates to a method and a device for building a new ballastway for an at least single-track rail line (100, 101) when there is initially no existing track. The new ballastway should have at least one PS layer (2) and one ballast layer (3), and the PS layer (2) is built up on a subgrade (1) and the ballast layer (3) is built up on the PS layer (2) in a continuous working process in a working direction (A). The PS layer (2) is built up by a PS layer-producing unit (20) (PSL unit), and the ballast layer (3) is built up by a ballast bed-producing unit (30), which is operated at a predefined distance behind the PSL unit (20) in relation to the working direction (A) and is equipped with a chain track or caterpillar track (31) for driving on the PS layer (2). The PSL unit (20) and the ballast bed-producing unit (30) are each supplied with the materials (K, S) needed to build up the PS layer (2) and the ballast layer (3) by means of an associated conveying device (12a, 12b) from at least one open-top wagon (10a, 10b), which is operated at a predefined distance in front of the PSL unit (20) in relation to the working direction (A).
La présente invention concerne un procédé et un dispositif de construction d'une nouvelle ligne ferroviaire pour une voie ferrée (100, 101) au moins à voie unique s'il n'existe pas de ligne de chemin de fer de sortie. La nouvelle ligne ferroviaire doit présenter au moins une couche PS (2) et une couche de ballast (3), et la couche PS (2) est mise en place sur une terre dégagée (1) et la couche de ballast (3) est mise en place sur la couche (2) dans une direction de travail (A) en un cycle de travail continu. La couche PS (2) est mise en place par un finisseur de couche PS (20) (finisseur PSS) et la couche de ballast (3) est mise en place par un finisseur de couche de ballast (30) qui est exploité à une distance prédéterminée par rapport à la direction de travail (A), derrière le finisseur PSS (20) et est muni d'un train chenillé ou d'un véhicule à chenilles (31) permettant de traverser la couche PS (2). Les matériaux (K, S) nécessaires à la mise en place de la couche PS (2) et de la couche de ballast (3) sont acheminés au finisseur PSS (20) et au finisseur de couche de ballast (30) par un wagon-trémie (10a, 10b), au moyen d'un convoyeur (12a, 12b) respectivement associé, le wagon-trémie étant exploité à une distance prédéterminée par rapport à la direction de travail (A), devant le finisseur PSS (20).
METHOD FOR BUILDING A NEW BALLASTWAY FOR A RAIL LINE
The present invention relates to a method and a device for building a new ballastway for an at least single-track rail line (100, 101) when there is initially no existing track. The new ballastway should have at least one PS layer (2) and one ballast layer (3), and the PS layer (2) is built up on a subgrade (1) and the ballast layer (3) is built up on the PS layer (2) in a continuous working process in a working direction (A). The PS layer (2) is built up by a PS layer-producing unit (20) (PSL unit), and the ballast layer (3) is built up by a ballast bed-producing unit (30), which is operated at a predefined distance behind the PSL unit (20) in relation to the working direction (A) and is equipped with a chain track or caterpillar track (31) for driving on the PS layer (2). The PSL unit (20) and the ballast bed-producing unit (30) are each supplied with the materials (K, S) needed to build up the PS layer (2) and the ballast layer (3) by means of an associated conveying device (12a, 12b) from at least one open-top wagon (10a, 10b), which is operated at a predefined distance in front of the PSL unit (20) in relation to the working direction (A).
La présente invention concerne un procédé et un dispositif de construction d'une nouvelle ligne ferroviaire pour une voie ferrée (100, 101) au moins à voie unique s'il n'existe pas de ligne de chemin de fer de sortie. La nouvelle ligne ferroviaire doit présenter au moins une couche PS (2) et une couche de ballast (3), et la couche PS (2) est mise en place sur une terre dégagée (1) et la couche de ballast (3) est mise en place sur la couche (2) dans une direction de travail (A) en un cycle de travail continu. La couche PS (2) est mise en place par un finisseur de couche PS (20) (finisseur PSS) et la couche de ballast (3) est mise en place par un finisseur de couche de ballast (30) qui est exploité à une distance prédéterminée par rapport à la direction de travail (A), derrière le finisseur PSS (20) et est muni d'un train chenillé ou d'un véhicule à chenilles (31) permettant de traverser la couche PS (2). Les matériaux (K, S) nécessaires à la mise en place de la couche PS (2) et de la couche de ballast (3) sont acheminés au finisseur PSS (20) et au finisseur de couche de ballast (30) par un wagon-trémie (10a, 10b), au moyen d'un convoyeur (12a, 12b) respectivement associé, le wagon-trémie étant exploité à une distance prédéterminée par rapport à la direction de travail (A), devant le finisseur PSS (20).
METHOD FOR BUILDING A NEW BALLASTWAY FOR A RAIL LINE
METHODE DE CONSTRUCTION D'UNE NOUVELLE VOIE BALLASTEE POUR UNE LIGNE DE CHEMIN DE FER
ZURCHER RALF (Autor:in)
14.09.2021
Patent
Elektronische Ressource
Englisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Engineering Index Backfile | 1929
Building Types Study 824 - Millennium Rail Line, Canada
Online Contents | 2003
|Device and method for building a new ballastway for a rail line
Europäisches Patentamt | 2022
|Device and Method for Building a New Ballastway for a Rail Line
Europäisches Patentamt | 2021
|