Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rapid construction method for offshore reinforced concrete frame structure
The invention provides a rapid construction method for an offshore reinforced concrete frame structure. The rapid construction method for the offshore reinforced concrete frame structure comprises the following steps of step 01 beam column framework prefabrication, prefabricating a beam column framework which is formed by a vertical column and not less than one layer of horizontally cross beams through concrete at a smooth and open position; step 02 integrally hanging the beam column framework, transporting the beam column framework through a scow and hanging the beam column framework through a floating crane after concrete cast-in-situ of the beam column framework is finished and the intensity achieves the design intensity; step 03 concrete cast-in-situ of floor slabs, arranging a mixer on a mixing ship or a platform and enabling a crane cableway bucket to perform floor board pouring; S04 brickwork and decoration engineering construction which comprises performing brickwork and decoration engineering construction on the beam column framework. According to the rapid construction method for the offshore reinforced concrete frame structure, the integral fabrication hanging technology is adopted, the construction work efficiency is improved, and the construction period is shortened.
Rapid construction method for offshore reinforced concrete frame structure
The invention provides a rapid construction method for an offshore reinforced concrete frame structure. The rapid construction method for the offshore reinforced concrete frame structure comprises the following steps of step 01 beam column framework prefabrication, prefabricating a beam column framework which is formed by a vertical column and not less than one layer of horizontally cross beams through concrete at a smooth and open position; step 02 integrally hanging the beam column framework, transporting the beam column framework through a scow and hanging the beam column framework through a floating crane after concrete cast-in-situ of the beam column framework is finished and the intensity achieves the design intensity; step 03 concrete cast-in-situ of floor slabs, arranging a mixer on a mixing ship or a platform and enabling a crane cableway bucket to perform floor board pouring; S04 brickwork and decoration engineering construction which comprises performing brickwork and decoration engineering construction on the beam column framework. According to the rapid construction method for the offshore reinforced concrete frame structure, the integral fabrication hanging technology is adopted, the construction work efficiency is improved, and the construction period is shortened.
Rapid construction method for offshore reinforced concrete frame structure
DENG SHANGKANG (Autor:in) / JU ZHIAN (Autor:in) / ZHOU CHUNLIN (Autor:in) / LI LIN EN (Autor:in) / BI LILI (Autor:in) / LIN CHAOWEI (Autor:in)
01.04.2015
Patent
Elektronische Ressource
Englisch
Construction method of reinforced concrete frame structure
Europäisches Patentamt | 2021
|Reinforced concrete frame reinforcing structure and construction method
Europäisches Patentamt | 2024
|Construction method of reinforced concrete fabricated frame structure
Europäisches Patentamt | 2024
|Reinforced concrete frame structure and construction method thereof
Europäisches Patentamt | 2025
|Reinforced concrete block frame structure and construction method thereof
Europäisches Patentamt | 2015
|