Combined rainwater seepage well and construction method
The invention discloses a combined rainwater seepage well and a construction method, belongs to the field of drainage projects, and particularly relates to a structure for discarding initial rainwater, adjusting the rainwater and supplying underground water by seeped rainwater. The combined rainwater seepage well mainly comprises a shaft, a pipe and a well body, wherein the shaft is positioned on the lower portion of the well body; and the pipe is connected with the well body. Seepage wells are arranged on a rainwater pipe at intervals of 1-3 inspection wells, rainwater is collected through the pipe during raining and seeps into the ground through the seepage well, the flow of the rainwater is reduced at the source, an effect of shifting peaks and adjusting storage is achieved, and waterlogging caused by accumulated water on the ground is reduced. The shaft is filled with filter materials, a slime pit is arranged on the bottom of the well body, a filter screen is arranged on the bottom of the slime pit, and the rainwater is filtered by the filter materials, seeps into the ground and supplements the underground water. The seepage well is constructed in a combined mode, the well body on the upper portion of the seepage well is constructed by using a down-top method, different sections of the shaft on the lower portion of the seepage well are constructed one by one by using a top-down method, and the construction difficulty and the manufacturing cost are greatly reduced.
Combined rainwater seepage well and construction method
The invention discloses a combined rainwater seepage well and a construction method, belongs to the field of drainage projects, and particularly relates to a structure for discarding initial rainwater, adjusting the rainwater and supplying underground water by seeped rainwater. The combined rainwater seepage well mainly comprises a shaft, a pipe and a well body, wherein the shaft is positioned on the lower portion of the well body; and the pipe is connected with the well body. Seepage wells are arranged on a rainwater pipe at intervals of 1-3 inspection wells, rainwater is collected through the pipe during raining and seeps into the ground through the seepage well, the flow of the rainwater is reduced at the source, an effect of shifting peaks and adjusting storage is achieved, and waterlogging caused by accumulated water on the ground is reduced. The shaft is filled with filter materials, a slime pit is arranged on the bottom of the well body, a filter screen is arranged on the bottom of the slime pit, and the rainwater is filtered by the filter materials, seeps into the ground and supplements the underground water. The seepage well is constructed in a combined mode, the well body on the upper portion of the seepage well is constructed by using a down-top method, different sections of the shaft on the lower portion of the seepage well are constructed one by one by using a top-down method, and the construction difficulty and the manufacturing cost are greatly reduced.
Combined rainwater seepage well and construction method
LI XIAOLIN (Autor:in) / HAO SHENQUN (Autor:in) / HU BIN (Autor:in) / LI JIANFENG (Autor:in) / LIU JIANHUA (Autor:in) / HOU DINGDING (Autor:in) / ZHANG YANFENG (Autor:in) / WU SONG (Autor:in) / SONG GUOJUN (Autor:in) / YU YANG (Autor:in)
08.04.2015
Patent
Elektronische Ressource
Englisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Rainwater seepage well for urban flood control and drainage
Europäisches Patentamt | 2022
|