Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Inversed construction method for adding basement in existing building
The invention discloses an inversed construction method for adding a basement in the existing building. The method includes that drilling pressure grouting piles and a bearing table are arranged on the periphery of the original foundation bearing table according to the design parameters of the original building, the drilling pressure grouting piles and the bearing table are utilized to support an upper structure frame stressed column, the bearing table is expanded to achieve foundation support replacement in the way that the upper frame column load can be borne effectively, then soil excavation is conducted to the design base elevation, an extrusion sleeve is connected with the drilling pressure grouting pile group, the high strength grouting material is utilized to pour wall columns formed by the newly added design pile and the frame column, then construction of base layers, water resistance, base plates and the like is conducted, and the frame column is connected with the foundation base plate in an inversed downwards mode. The existing building type and use functions on the ground are maintained, inversed basement layer adding and construction are performed simultaneously, the construction duration is short, the construction is independent, the cost is low and the effect of protecting environment is achieved. The method is especially applicable to multi-layer frame buildings, engineering with the upper building structure style not changed and the engineering with the basement requiring inversed layer adding.
Inversed construction method for adding basement in existing building
The invention discloses an inversed construction method for adding a basement in the existing building. The method includes that drilling pressure grouting piles and a bearing table are arranged on the periphery of the original foundation bearing table according to the design parameters of the original building, the drilling pressure grouting piles and the bearing table are utilized to support an upper structure frame stressed column, the bearing table is expanded to achieve foundation support replacement in the way that the upper frame column load can be borne effectively, then soil excavation is conducted to the design base elevation, an extrusion sleeve is connected with the drilling pressure grouting pile group, the high strength grouting material is utilized to pour wall columns formed by the newly added design pile and the frame column, then construction of base layers, water resistance, base plates and the like is conducted, and the frame column is connected with the foundation base plate in an inversed downwards mode. The existing building type and use functions on the ground are maintained, inversed basement layer adding and construction are performed simultaneously, the construction duration is short, the construction is independent, the cost is low and the effect of protecting environment is achieved. The method is especially applicable to multi-layer frame buildings, engineering with the upper building structure style not changed and the engineering with the basement requiring inversed layer adding.
Inversed construction method for adding basement in existing building
CHEN YAOGANG (Autor:in) / ZHANG JUN (Autor:in) / ZHANG LEI (Autor:in) / GU CHUNMING (Autor:in)
22.04.2015
Patent
Elektronische Ressource
Englisch
Method for adding basement to existing building and basement of existing building
Europäisches Patentamt | 2024
|Raft foundation existing building basement storey adding method
Europäisches Patentamt | 2024
|Integrated top-down storey-adding construction method for existing basement piles
Europäisches Patentamt | 2024
|Frame structure existing building top-down multi-storey basement storey-adding method
Europäisches Patentamt | 2024
|Construction method for rebuilding existing building basement bottom plate
Europäisches Patentamt | 2021
|