Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction
The invention relates to an irregularly-shaped gasbag and a rapid construction method using the irregularly-shaped gasbag as an underground continuous wall junction. The irregularly-shaped gasbag 1 comprises an air faucet 2; resistant nails 3, which are solid and hemispherical, are arranged on the outer wall of the irregularly-shaped gasbag 1 in the form of a quincunx. The rapid construction method comprises the following steps: (1) utilizing the irregularly-shaped gasbag 1 to divide a groove 4 into a plurality of groove sections 5 during construction; (2) putting counterweight balls 7 onto the inner bottom of the irregularly-shaped gasbag 1; (3) inflating the irregularly-shaped gasbag 1 through the air faucet 2 till the irregularly-shaped gasbag 1 is expanded enough; (4) pouring an impermeable material into the groove sections 5 which are positioned on both sides of the irregularly-shaped gasbag 1, deflating the irregularly-shaped gasbag 1 when the strength of the impermeable material reaches a certain degree, and taking out the irregularly-shaped gasbag 1; (5) sufficiently flushing a cavity where the irregularly-shaped gasbag 1 is positioned, and pouring a second-phase impermeable material into the cavity to integrate all the groove sections 5; (6) after the process is finished, carrying out subsequent wall construction in the same manner.
Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction
The invention relates to an irregularly-shaped gasbag and a rapid construction method using the irregularly-shaped gasbag as an underground continuous wall junction. The irregularly-shaped gasbag 1 comprises an air faucet 2; resistant nails 3, which are solid and hemispherical, are arranged on the outer wall of the irregularly-shaped gasbag 1 in the form of a quincunx. The rapid construction method comprises the following steps: (1) utilizing the irregularly-shaped gasbag 1 to divide a groove 4 into a plurality of groove sections 5 during construction; (2) putting counterweight balls 7 onto the inner bottom of the irregularly-shaped gasbag 1; (3) inflating the irregularly-shaped gasbag 1 through the air faucet 2 till the irregularly-shaped gasbag 1 is expanded enough; (4) pouring an impermeable material into the groove sections 5 which are positioned on both sides of the irregularly-shaped gasbag 1, deflating the irregularly-shaped gasbag 1 when the strength of the impermeable material reaches a certain degree, and taking out the irregularly-shaped gasbag 1; (5) sufficiently flushing a cavity where the irregularly-shaped gasbag 1 is positioned, and pouring a second-phase impermeable material into the cavity to integrate all the groove sections 5; (6) after the process is finished, carrying out subsequent wall construction in the same manner.
Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction
ZHANG LIXIN (Autor:in) / DUAN QINGYING (Autor:in) / ZHANG LIHUA (Autor:in) / DUAN QINGLING (Autor:in) / LI YONG (Autor:in) / YU HAIYANG (Autor:in) / NIU JINGTAO (Autor:in)
29.04.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Magnetorheological Flexible Gasbag Polishing Technique
British Library Online Contents | 2009
|IRREGULARLY-SHAPED-BLOCK INVERTING DEVICE AND IRREGULARLY-SHAPED-BLOCK PLACEMENT METHOD
Europäisches Patentamt | 2017
|MANUFACTURING METHOD FOR IRREGULARLY SHAPED REINFORCING BAR AND IRREGULARLY SHAPED REINFORCING-BAR
Europäisches Patentamt | 2016
|A New Method of Pulse Technique in Gasbag Polishing
British Library Online Contents | 2010
|