Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
House wall structure and body structure post-casting integrative construction method and house
The invention relates to a house wall structure and body structure post-casting integrative construction method and a house. The method comprises the following steps of firstly, casting a body structure; secondly, installing a wall structure formwork and a water and electricity pipeline after concrete of the body structure achieves the design strength and releases corresponding stress; finally, casting the wall structure through pump concrete. The construction process is simplified, the construction period is short, the aims of energy conservation and consumption reduction are achieved, meanwhile, the discharge of construction waste generated by one-time processing completes of project section quantity is less, the site civilized construction degree is high, and the defects of follow-up construction and handover process of multiple processes of late floors are overcome; in addition, the wall structure is casted by novel light-weight and anti-crack concrete, good in molding, easy to control surface perpendicularity and flatness, light in weight, environmental-friendly and energy-saving, high in compressive strength and good in thermal insulation property, confirms to finish concrete standard so as to be free of working procedures such as internal and external wall plastering, and avoids the quality problems such as hollowing, cracking and leakage caused by plastering.
House wall structure and body structure post-casting integrative construction method and house
The invention relates to a house wall structure and body structure post-casting integrative construction method and a house. The method comprises the following steps of firstly, casting a body structure; secondly, installing a wall structure formwork and a water and electricity pipeline after concrete of the body structure achieves the design strength and releases corresponding stress; finally, casting the wall structure through pump concrete. The construction process is simplified, the construction period is short, the aims of energy conservation and consumption reduction are achieved, meanwhile, the discharge of construction waste generated by one-time processing completes of project section quantity is less, the site civilized construction degree is high, and the defects of follow-up construction and handover process of multiple processes of late floors are overcome; in addition, the wall structure is casted by novel light-weight and anti-crack concrete, good in molding, easy to control surface perpendicularity and flatness, light in weight, environmental-friendly and energy-saving, high in compressive strength and good in thermal insulation property, confirms to finish concrete standard so as to be free of working procedures such as internal and external wall plastering, and avoids the quality problems such as hollowing, cracking and leakage caused by plastering.
House wall structure and body structure post-casting integrative construction method and house
HUANG PENG (Autor:in) / WANG AIZHI (Autor:in) / XU LEI (Autor:in) / WANG JUN (Autor:in) / ZHANG LING (Autor:in)
06.05.2015
Patent
Elektronische Ressource
Englisch
House building wall body structure and construction method
Europäisches Patentamt | 2021
|House building wall structure and construction method
Europäisches Patentamt | 2023
|House building wall structure and construction method
Europäisches Patentamt | 2024
|House building wall structure and construction method
Europäisches Patentamt | 2020
|Integral constructing method of house body structure and wall structure and house
Europäisches Patentamt | 2015
|