Upper-layer and lower-layer joined-paving construction method of cement stabilized macadam
The invention provides an upper-layer and lower-layer joined-paving construction method of cement stabilized macadam. The upper-layer and lower-layer joined-paving construction method comprises the following steps: (a) paving a lower layer, namely, paving a lower-layer cement stabilized macadam mixture layer on a pavement, grinding the lower-layer cement stabilized macadam mixture layer; and (b) paving an upper layer, namely, within 12 hours since mixing of a cement stabilized macadam mixture of the lower-layer cement stabilized macadam mixture layer, paying an upper-layer cement stabilized macadam mixture layer on the upper surface of the lower-layer cement stabilized macadam mixture layer formed by rolling, and rolling the upper-layer cement stabilized macadam mixture layer. According to the upper-layer and lower-layer joined-paving construction method of the cement stabilized macadam, provided by the invention, the interlayer bonding strength is ensured, the interlayer construction time can be relatively prolonged, and the construction efficiency is improved.
Upper-layer and lower-layer joined-paving construction method of cement stabilized macadam
The invention provides an upper-layer and lower-layer joined-paving construction method of cement stabilized macadam. The upper-layer and lower-layer joined-paving construction method comprises the following steps: (a) paving a lower layer, namely, paving a lower-layer cement stabilized macadam mixture layer on a pavement, grinding the lower-layer cement stabilized macadam mixture layer; and (b) paving an upper layer, namely, within 12 hours since mixing of a cement stabilized macadam mixture of the lower-layer cement stabilized macadam mixture layer, paying an upper-layer cement stabilized macadam mixture layer on the upper surface of the lower-layer cement stabilized macadam mixture layer formed by rolling, and rolling the upper-layer cement stabilized macadam mixture layer. According to the upper-layer and lower-layer joined-paving construction method of the cement stabilized macadam, provided by the invention, the interlayer bonding strength is ensured, the interlayer construction time can be relatively prolonged, and the construction efficiency is improved.
Upper-layer and lower-layer joined-paving construction method of cement stabilized macadam
WANG YUGUO (Autor:in) / REN WEITAO (Autor:in) / WANG ZHENJIANG (Autor:in) / MA YONGQING (Autor:in) / LIU QILIANG (Autor:in) / HUANG LIGUO (Autor:in) / DU JUAN (Autor:in) / CAI XINNING (Autor:in) / WANG DINGFENG (Autor:in) / WANG TENGFEI (Autor:in)
20.05.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Cement stabilized macadam double-layer continuous paving equipment
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Construction method of cement stabilized macadam layer
Europäisches Patentamt | 2024
|Construction paving device for cement stabilized macadam base
Europäisches Patentamt | 2024
|