Construction method for vertical draining and seepage well of tailings dam
The invention provides a construction method for a vertical draining and seepage well of a tailings dam. The construction method for the vertical draining and seepage well of the tailings dam comprises the following steps of (1) determining the position of the vertical draining and seepage well (7); (2) fixing a protecting casing (13) at the position of the vertical draining and seepage well (7); (3) inserting a plastic blind body (9) in the protecting casing (13) and forming an annular accommodating cavity between the plastic blind body (9) and the protecting casing (13); (4) feeding drift waste stones or distribution aggregates (11) in the annular accommodating cavity; (5) dispersively discharging ore on the top of a beach in the front of the dam uniformly; and (6) pulling out the protecting casing (13). By the construction method, the problem that the embedded vertical draining and seepage well is blocked by tailings sludge in an ore discharging process can be solved effectively. The construction method is simple, construction is facilitated, the cost cannot be increased excessively, more importantly, the follow-up draining and seepage effect of the vertical draining and seepage well can be guaranteed, and running safety of a tailings pond is ensured.
Construction method for vertical draining and seepage well of tailings dam
The invention provides a construction method for a vertical draining and seepage well of a tailings dam. The construction method for the vertical draining and seepage well of the tailings dam comprises the following steps of (1) determining the position of the vertical draining and seepage well (7); (2) fixing a protecting casing (13) at the position of the vertical draining and seepage well (7); (3) inserting a plastic blind body (9) in the protecting casing (13) and forming an annular accommodating cavity between the plastic blind body (9) and the protecting casing (13); (4) feeding drift waste stones or distribution aggregates (11) in the annular accommodating cavity; (5) dispersively discharging ore on the top of a beach in the front of the dam uniformly; and (6) pulling out the protecting casing (13). By the construction method, the problem that the embedded vertical draining and seepage well is blocked by tailings sludge in an ore discharging process can be solved effectively. The construction method is simple, construction is facilitated, the cost cannot be increased excessively, more importantly, the follow-up draining and seepage effect of the vertical draining and seepage well can be guaranteed, and running safety of a tailings pond is ensured.
Construction method for vertical draining and seepage well of tailings dam
YUAN ZIYOU (Autor:in) / WANG LIBIN (Autor:in) / FAN YUJIAO (Autor:in) / YANG YULAN (Autor:in) / LI YUEQIANG (Autor:in) / LI RUIHONG (Autor:in) / HOU PAN (Autor:in) / ZHOU YULONG (Autor:in) / GUO ZHONGYUE (Autor:in) / CHEN YUQING (Autor:in)
03.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Seepage draining method for fine-grained tailing pond, seepage draining system and application
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2015
|Europäisches Patentamt | 2015
|Europäisches Patentamt | 2022
|Vertical anti-seepage frame and vertical anti-seepage wall body construction method
Europäisches Patentamt | 2024
|