Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Vertical temporary passage for entering and exiting immersed tube and construction method of vertical temporary passage
The invention relates to the field of floating transport construction of a submarine immersed tube tunnel, and provides a vertical temporary passage for entering and exiting an immersed tube and a construction method of the vertical temporary passage. The vertical temporary passage has the advantages that the temporary passage is arranged under a manhole well, and the passing at the exterior and in a tube joint can be realized by the temporary passage in a tube joint sinking installation process of the immersed tube, so as to facilitate the subsequent construction; the temporary passage is stable and durable; the construction and detachment are simple, convenient and rapid, and repeated detachment and installation for multiple times are realized; after the temporary passage is detached, since the size is small, the transportation and storage are convenient.
Vertical temporary passage for entering and exiting immersed tube and construction method of vertical temporary passage
The invention relates to the field of floating transport construction of a submarine immersed tube tunnel, and provides a vertical temporary passage for entering and exiting an immersed tube and a construction method of the vertical temporary passage. The vertical temporary passage has the advantages that the temporary passage is arranged under a manhole well, and the passing at the exterior and in a tube joint can be realized by the temporary passage in a tube joint sinking installation process of the immersed tube, so as to facilitate the subsequent construction; the temporary passage is stable and durable; the construction and detachment are simple, convenient and rapid, and repeated detachment and installation for multiple times are realized; after the temporary passage is detached, since the size is small, the transportation and storage are convenient.
Vertical temporary passage for entering and exiting immersed tube and construction method of vertical temporary passage
ZHANG WENSEN (Autor:in) / CHEN CONG (Autor:in) / HUANG YUELONG (Autor:in) / DAI SHUANGQUAN (Autor:in) / MENG QINGLONG (Autor:in)
03.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Temporary passage above ballast tank and passage mounting method
Europäisches Patentamt | 2015
|