Construction method of bituminous coating pile in sandy foundation
The invention discloses a construction method of a bituminous coating pile in a sandy foundation. The construction method is characterized in that the bituminous coating pile is hammered and driven under the protection action of a steel sleeve. The construction method specially comprises the construction steps that the steel sleeve penetrates through a backfill sandy soil layer and is driven into a soft soil layer laid at the bottom of the sandy soil layer; the bituminous coating pile in the steel sleeve is driven into a bearing stratum, and the steel sleeve is clamped, pulled and taken out through a vibratory hammer. Compared with the prior art, the construction method has the advantages that a bituminous coating is completely protected, the effect that negative friction is reduced through the bituminous coating is fully achieved, operation is easy, the project quality is reliable, the adaptability is high, the construction method is particularly applicable to a pile foundation project with the soft soil layer at the bottom and a thick backfill sandy foundation on the top in a covering mode, the problem of the negative friction can be effectively solved, and the construction quality of the pile foundation project is improved.
Construction method of bituminous coating pile in sandy foundation
The invention discloses a construction method of a bituminous coating pile in a sandy foundation. The construction method is characterized in that the bituminous coating pile is hammered and driven under the protection action of a steel sleeve. The construction method specially comprises the construction steps that the steel sleeve penetrates through a backfill sandy soil layer and is driven into a soft soil layer laid at the bottom of the sandy soil layer; the bituminous coating pile in the steel sleeve is driven into a bearing stratum, and the steel sleeve is clamped, pulled and taken out through a vibratory hammer. Compared with the prior art, the construction method has the advantages that a bituminous coating is completely protected, the effect that negative friction is reduced through the bituminous coating is fully achieved, operation is easy, the project quality is reliable, the adaptability is high, the construction method is particularly applicable to a pile foundation project with the soft soil layer at the bottom and a thick backfill sandy foundation on the top in a covering mode, the problem of the negative friction can be effectively solved, and the construction quality of the pile foundation project is improved.
Construction method of bituminous coating pile in sandy foundation
MA YONGPING (Autor:in) / HUANG HAIYUN (Autor:in) / QIAN YUQI (Autor:in)
10.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Sandy soil stratum combined pile foundation construction device and method
Europäisches Patentamt | 2024
|Construction method of deep foundation pit sandy soil slope pile foundation bearing platform
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2015
|Combined hole-forming construction method for Binjiang sandy gravel geological pile foundation
Europäisches Patentamt | 2024
|Pile foundation construction platform and pile foundation construction method
Europäisches Patentamt | 2020
|