Construction method of deep stirring and jet grouting compound pile waterproof curtain
The invention discloses a construction method of a deep stirring and jet grouting compound pile waterproof curtain, and a construction method of a deep foundation pit waterproof curtain having a waterproof requirement. Firstly, the stirring pile beating construction is performed for a low-strength soil layer above a rock layer by a three-shaft stirring pile machine; then, a drilling machine is used for predrilling the condensed three-shaft stirring pile machine at the upper part and the high-strength soil layer at the lower part and drilling into the rock layer at the bottom; and finally, the high-pressure jet grouting pile construction is performed for the lower end of the three-shaft cement stirring pile to the rock layer through leading jet grouting cement slurry into the predrilled holes by a high-pressure jet grouting pile machine, so that the three-shaft cement stirring pile and the high-pressure jet grouting pile are built to form a waterproof pile body to form a continuous closed wall. It has been found that the method not only solves the waterproof problem of the deep foundation pit (in particular, a deep foundation pit rock socket), but also achieves the effects of saving the cost, rising the construction speed, reducing the labor intensity and shortening the construction period.
Construction method of deep stirring and jet grouting compound pile waterproof curtain
The invention discloses a construction method of a deep stirring and jet grouting compound pile waterproof curtain, and a construction method of a deep foundation pit waterproof curtain having a waterproof requirement. Firstly, the stirring pile beating construction is performed for a low-strength soil layer above a rock layer by a three-shaft stirring pile machine; then, a drilling machine is used for predrilling the condensed three-shaft stirring pile machine at the upper part and the high-strength soil layer at the lower part and drilling into the rock layer at the bottom; and finally, the high-pressure jet grouting pile construction is performed for the lower end of the three-shaft cement stirring pile to the rock layer through leading jet grouting cement slurry into the predrilled holes by a high-pressure jet grouting pile machine, so that the three-shaft cement stirring pile and the high-pressure jet grouting pile are built to form a waterproof pile body to form a continuous closed wall. It has been found that the method not only solves the waterproof problem of the deep foundation pit (in particular, a deep foundation pit rock socket), but also achieves the effects of saving the cost, rising the construction speed, reducing the labor intensity and shortening the construction period.
Construction method of deep stirring and jet grouting compound pile waterproof curtain
YANG XIAOMING (Autor:in) / YANG JIBAO (Autor:in) / LEI FENGSHENG (Autor:in) / WEN YANLING (Autor:in) / CHEN ZHIWEI (Autor:in) / ZHANG SONGLIN (Autor:in) / WANG LEI (Autor:in) / ZHANG FUHONG (Autor:in) / CHEN JIANMIN (Autor:in) / YU DONGYANG (Autor:in)
10.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
High-pressure jet grouting pile waterproof curtain construction method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|High-pressure jet grouting pile waterproof curtain construction device
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|High pressure jet grouting pile waterproof curtain construction device and method
Europäisches Patentamt | 2015
|