Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Standardized steel corbel and method for arranging standard steel corbel on existing reinforced concrete stand column
The invention relates to a building structural component, in particular to a standardized steel corbel and a method for arranging the standard steel corbel on an existing reinforced concrete stand column. The standardized steel corbel which can be conveniently and directly selected by design personnel for use and a construction method for manufacturing the steel corbel for supplement by drilling holes in the existing reinforced concrete stand column and pouring JGN flue are provided for solving the technical problems. The method is simple in process, safe and reliable, appearance is attractive, the construction period is greatly shortened compared with a traditional method for manufacturing the steel corbel for supplement by matching traditional civil engineering and anchor bars, and the bonding strength of the steel corbel exceeds that of ordinary concrete. The standardized steel corbel and the method are particularly suitable for industrial factory refitting of reinforced concrete structure such as thermal power plants, hydropower stations and transformer substations.
Standardized steel corbel and method for arranging standard steel corbel on existing reinforced concrete stand column
The invention relates to a building structural component, in particular to a standardized steel corbel and a method for arranging the standard steel corbel on an existing reinforced concrete stand column. The standardized steel corbel which can be conveniently and directly selected by design personnel for use and a construction method for manufacturing the steel corbel for supplement by drilling holes in the existing reinforced concrete stand column and pouring JGN flue are provided for solving the technical problems. The method is simple in process, safe and reliable, appearance is attractive, the construction period is greatly shortened compared with a traditional method for manufacturing the steel corbel for supplement by matching traditional civil engineering and anchor bars, and the bonding strength of the steel corbel exceeds that of ordinary concrete. The standardized steel corbel and the method are particularly suitable for industrial factory refitting of reinforced concrete structure such as thermal power plants, hydropower stations and transformer substations.
Standardized steel corbel and method for arranging standard steel corbel on existing reinforced concrete stand column
ZHUO HUI (Autor:in) / LIU YONGJUN (Autor:in) / HUANG NINGMEI (Autor:in) / LI JIESHENG (Autor:in) / MO JIAO (Autor:in) / JIN YI (Autor:in) / LIANG YUANZHONG (Autor:in)
10.06.2015
Patent
Elektronische Ressource
Englisch
Europäisches Patentamt | 2023
|Steel corbel device and construction method for jacking bridge through steel corbel device
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|