Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Modularization formwork for concrete pouring
A modularization formwork for concrete pouring comprises first components, a first side end cover, a second side end cover, an upper end cover and a lower end cover. The first components are made of hollow first sectional bars provided with first grooves. An upper groove and a lower groove connected with the corresponding first groove are formed in the upper end and the lower end of each first component respectively. The first side end cover and the second side end cover are made of second sectional bars with cavities, first protruding parts are arranged on the cross section sides of the second sectional bars, second protruding parts and third protruding parts are arranged on the other sides opposite to the cross section sides, the first protruding parts and the second protruding parts are arranged at intervals, and second grooves are formed between the second protruding parts and the third protruding parts. The upper end cover and the lower end cover are formed by cutting the second sectional bars into the preset length, and first protruding parts, second protruding parts, third protruding parts and second grooves are correspondingly arranged. The first grooves, the second grooves, the upper grooves and the lower grooves are roughly the same in shape and size and are suitable for containing the first protruding parts. The modularization formwork can be manufactured into the size conforming to the building standardization and can be repeatedly used hundreds of times, and therefore a large amount of wood can be saved.
Modularization formwork for concrete pouring
A modularization formwork for concrete pouring comprises first components, a first side end cover, a second side end cover, an upper end cover and a lower end cover. The first components are made of hollow first sectional bars provided with first grooves. An upper groove and a lower groove connected with the corresponding first groove are formed in the upper end and the lower end of each first component respectively. The first side end cover and the second side end cover are made of second sectional bars with cavities, first protruding parts are arranged on the cross section sides of the second sectional bars, second protruding parts and third protruding parts are arranged on the other sides opposite to the cross section sides, the first protruding parts and the second protruding parts are arranged at intervals, and second grooves are formed between the second protruding parts and the third protruding parts. The upper end cover and the lower end cover are formed by cutting the second sectional bars into the preset length, and first protruding parts, second protruding parts, third protruding parts and second grooves are correspondingly arranged. The first grooves, the second grooves, the upper grooves and the lower grooves are roughly the same in shape and size and are suitable for containing the first protruding parts. The modularization formwork can be manufactured into the size conforming to the building standardization and can be repeatedly used hundreds of times, and therefore a large amount of wood can be saved.
Modularization formwork for concrete pouring
YIN YIQING (Autor:in) / LIU LI (Autor:in) / DONG XIANGRONG (Autor:in)
17.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete pouring formwork and concrete pouring method
Europäisches Patentamt | 2023
|Formwork structure for concrete pouring and concrete pouring method
Europäisches Patentamt | 2021
|