Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a creeping-type cofferdam open cut method. The creeping-type cofferdam open cut method comprises the following steps that step one, a creeping-type cofferdam body is surrounded, a construction body (1), a dismantling body (2) and a building body (3) are sequentially surrounded by using an over-turned box body (11); step two, clay inside the construction body (1) is dug and removed, and a tunnel is built; step three, the dismantling body (2) is removed; step four, the building body (3) is built; step five, the step two, the step three and the step four are repeated until the tunnel construction is completed; during the step of dismantling body (2) removal in the step three, the detached dismantling body (2) can be reused as a new building body (3). The creeping-type cofferdam open cut method has the advantages that the construction cycle can be shortened, the sea route traffic in a wide sea area is uninfluenced, the long distance tunnel construction and the super long distance tunnel construction can be achieved, and the influence on the environment is little.
The invention relates to a creeping-type cofferdam open cut method. The creeping-type cofferdam open cut method comprises the following steps that step one, a creeping-type cofferdam body is surrounded, a construction body (1), a dismantling body (2) and a building body (3) are sequentially surrounded by using an over-turned box body (11); step two, clay inside the construction body (1) is dug and removed, and a tunnel is built; step three, the dismantling body (2) is removed; step four, the building body (3) is built; step five, the step two, the step three and the step four are repeated until the tunnel construction is completed; during the step of dismantling body (2) removal in the step three, the detached dismantling body (2) can be reused as a new building body (3). The creeping-type cofferdam open cut method has the advantages that the construction cycle can be shortened, the sea route traffic in a wide sea area is uninfluenced, the long distance tunnel construction and the super long distance tunnel construction can be achieved, and the influence on the environment is little.
Creeping-type cofferdam open cut method
WANG YUBIN (Autor:in)
24.06.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Open sea cofferdam and construction method of open sea cofferdam
Europäisches Patentamt | 2021
|Cofferdam construction method and cofferdam structure
Europäisches Patentamt | 2020
|TEMPORARY COFFERDAM METHOD, TEMPORARY COFFERDAM STRUCTURE
Europäisches Patentamt | 2022
|Adjustable cofferdam structure and cofferdam construction method
Europäisches Patentamt | 2023
|