Quick construction method for pressed bottom tile of large-span steel structure factory building roof
The invention discloses a quick construction method for pressed bottom tile of a large-span steel structure factory building roof. The quick construction method for the pressed bottom tile of the large-span steel structure factory building roof includes that 1) designing a movable measure platform with support legs and handrails, arranging rolling wheels at the downsides of the support legs, and paving channel steel on two crane beams to form an orbit; 2) horizontally arranging the movable measure platform on the two crane beams through the rolling wheels so as to make the movable measure platform capable of moving on the orbit; 3) constructing the pressed bottom tile of the factory building roof through a constructor on the measure platform. The quick construction method for the pressed bottom tile of the large-span steel structure factory building roof uses the crane beams of a standard factory building as support, truss support legs are set according to the roof height, the problem that the operation height of the bottom tile constructor is limited is well solved, and the construction method can be used for constructing the bottom tiles of different heights of factory buildings. The truss is movable, the move range of the worker on the platform is larger, the construction region limitation is solved, the bottom tile is faster and more convenient to mount, and the construction efficiency is improved.
Quick construction method for pressed bottom tile of large-span steel structure factory building roof
The invention discloses a quick construction method for pressed bottom tile of a large-span steel structure factory building roof. The quick construction method for the pressed bottom tile of the large-span steel structure factory building roof includes that 1) designing a movable measure platform with support legs and handrails, arranging rolling wheels at the downsides of the support legs, and paving channel steel on two crane beams to form an orbit; 2) horizontally arranging the movable measure platform on the two crane beams through the rolling wheels so as to make the movable measure platform capable of moving on the orbit; 3) constructing the pressed bottom tile of the factory building roof through a constructor on the measure platform. The quick construction method for the pressed bottom tile of the large-span steel structure factory building roof uses the crane beams of a standard factory building as support, truss support legs are set according to the roof height, the problem that the operation height of the bottom tile constructor is limited is well solved, and the construction method can be used for constructing the bottom tiles of different heights of factory buildings. The truss is movable, the move range of the worker on the platform is larger, the construction region limitation is solved, the bottom tile is faster and more convenient to mount, and the construction efficiency is improved.
Quick construction method for pressed bottom tile of large-span steel structure factory building roof
ZHOU JING (Autor:in) / LIU JINFANG (Autor:in) / HE HUAN (Autor:in) / YU HAILIN (Autor:in) / HUANG YONG (Autor:in) / LIU GUANQI (Autor:in)
08.07.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Large-span old factory building roof renewal and transformation construction method
Europäisches Patentamt | 2024
|Large-span steel structure building roof splicing installation construction method
Europäisches Patentamt | 2021
|Large-span steel structure factory building roof boarding transport trolley and installation method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|