Flexible arch splicing method for steel trussed beams
The invention provides a flexible arch splicing method for steel trussed beams. The method includes the steps that steel pipe pile temporary piers are erected at the proper positions of side spans and a main span, steel pipe pile temporary supports are arranged on the two longitudinal sides of a middle pier, meanwhile, a middle pier bearing platform and side pier bearing platforms are each provided with a tower crane, all rod pieces of the steel trussed beams are suspended by the tower cranes to a beam conveying trolley, the side span steel trussed beams and the middle span steel trussed beam are symmetrically spliced in a suspended mode through suspended splicing cranes to the pier tops of temporary piers under the main span to be folded, and then arch ribs are folded in a suspended splicing mode on the folded steel trussed beams through long arm cranes. According to the flexible arch splicing method for the steel trussed beams, large-scale construction equipment such as a high tower truss, a cable crane and a gantry crane does not need to be used, the construction equipment investment is lowered, the construction risks are lowered, a plurality of construction procedures can be executed at the same time, the construction efficiency can be effectively improved, and the construction progress can be effectively accelerated; meanwhile, operation in water is reduced as much as possible, the navigation requirement is met, and construction is safe, easy and convenient.
Flexible arch splicing method for steel trussed beams
The invention provides a flexible arch splicing method for steel trussed beams. The method includes the steps that steel pipe pile temporary piers are erected at the proper positions of side spans and a main span, steel pipe pile temporary supports are arranged on the two longitudinal sides of a middle pier, meanwhile, a middle pier bearing platform and side pier bearing platforms are each provided with a tower crane, all rod pieces of the steel trussed beams are suspended by the tower cranes to a beam conveying trolley, the side span steel trussed beams and the middle span steel trussed beam are symmetrically spliced in a suspended mode through suspended splicing cranes to the pier tops of temporary piers under the main span to be folded, and then arch ribs are folded in a suspended splicing mode on the folded steel trussed beams through long arm cranes. According to the flexible arch splicing method for the steel trussed beams, large-scale construction equipment such as a high tower truss, a cable crane and a gantry crane does not need to be used, the construction equipment investment is lowered, the construction risks are lowered, a plurality of construction procedures can be executed at the same time, the construction efficiency can be effectively improved, and the construction progress can be effectively accelerated; meanwhile, operation in water is reduced as much as possible, the navigation requirement is met, and construction is safe, easy and convenient.
Flexible arch splicing method for steel trussed beams
ZHANG QING (Autor:in) / QI ZHANGUO (Autor:in) / LI XIANGHAI (Autor:in) / YUAN CHANGCHUN (Autor:in) / LIU LING (Autor:in)
22.07.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
Ice decenters trussed arch forms
Engineering Index Backfile | 1961
Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
Europäisches Patentamt | 2016
|Seismic design for steel trussed arch to multi-support excitations
Online Contents | 2007
|Seismic design for steel trussed arch to multi-support excitations
Elsevier | 2006
|Collapse Analysis of Steel Trussed Arch Structure Considering Damage Cumulative Effect
British Library Online Contents | 2014
|