Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Assembling method of rebar segments
The invention discloses an assembling method of rebar segments. The assembling method comprises the following steps: (1) erecting an assembling bed-jig I and an assembling bed-jig II; (2) assembling a first rebar segment on the assembling bed-jig I; (3) assembling a second rebar segment in the assembling bed-jig I by taking the first rebar segment as a benchmark segment; (4) removing a connection structure of the first rebar segment and the second rebar segment; (5) hoisting the second rebar segment to the assembling bed-jig II; (6) hoisting and moving the first rebar segment out of the assembling bed-jig I; (7) assembling the next rebar segment in the assembling bed-jig II by taking the second rebar segment as a benchmark segment; and (8) sequentially and repetitively carrying out the processes in the steps (4)-(7) until all the rebar segments are assembled. By adopting the assembling method of the rebar segments, the construction efficiency of installation of a cable bent tower is effectively enhanced, the construction quality is effectively improved, and the construction safety is guaranteed.
Assembling method of rebar segments
The invention discloses an assembling method of rebar segments. The assembling method comprises the following steps: (1) erecting an assembling bed-jig I and an assembling bed-jig II; (2) assembling a first rebar segment on the assembling bed-jig I; (3) assembling a second rebar segment in the assembling bed-jig I by taking the first rebar segment as a benchmark segment; (4) removing a connection structure of the first rebar segment and the second rebar segment; (5) hoisting the second rebar segment to the assembling bed-jig II; (6) hoisting and moving the first rebar segment out of the assembling bed-jig I; (7) assembling the next rebar segment in the assembling bed-jig II by taking the second rebar segment as a benchmark segment; and (8) sequentially and repetitively carrying out the processes in the steps (4)-(7) until all the rebar segments are assembled. By adopting the assembling method of the rebar segments, the construction efficiency of installation of a cable bent tower is effectively enhanced, the construction quality is effectively improved, and the construction safety is guaranteed.
Assembling method of rebar segments
XIAO XIANGRONG (Autor:in) / GUO GUANGSONG (Autor:in) / LU GUANNAN (Autor:in) / TAN XINGHUA (Autor:in) / YAO JIN (Autor:in) / WANG ZONGREN (Autor:in) / LI DEQIN (Autor:in) / GAO SHIQIANG (Autor:in) / ZHUANG ZHIZHENG (Autor:in) / SUN ZHANYING (Autor:in)
05.08.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
REBAR ASSEMBLING SYSTEM FOR CONSTRUCTING CONCRETE BEAMS
Europäisches Patentamt | 2022
REBAR ASSEMBLING SYSTEM FOR CONSTRUCTING CONCRETE BEAMS
Europäisches Patentamt | 2022
|Rebar coupler having sequential insert assembling structure
Europäisches Patentamt | 2020
|Rebar coupler having sequential insert assembling structure
Europäisches Patentamt | 2020