Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hard road construction method by naturally recharging underground water
The invention relates to a hard road construction method by naturally recharging underground water. The method is characterized in that the flattened soil ground is bored to an underground superficial sanding belt water storage layer, sands can be filled in holes, a rod-shaped tool is used for inserting into the hole filled with sands, a concrete foundation layer with a smooth surface is formed by casting the concrete, the rod-shaped tool is drawn, the hole can be continuously filled with sands to the plane of the concrete foundation layer, sands on the concrete foundation layer are compacted, road bricks are directly arranged on the surface of the sands to form the hard road, rain and snow water on hard road surface is rapidly and naturally recharged to the underground superficial sanding belt water storage layer through the road bricks slits by passing through the hole, and then is slowly penetrated to an underground deep sanding belt water storage layer.
Hard road construction method by naturally recharging underground water
The invention relates to a hard road construction method by naturally recharging underground water. The method is characterized in that the flattened soil ground is bored to an underground superficial sanding belt water storage layer, sands can be filled in holes, a rod-shaped tool is used for inserting into the hole filled with sands, a concrete foundation layer with a smooth surface is formed by casting the concrete, the rod-shaped tool is drawn, the hole can be continuously filled with sands to the plane of the concrete foundation layer, sands on the concrete foundation layer are compacted, road bricks are directly arranged on the surface of the sands to form the hard road, rain and snow water on hard road surface is rapidly and naturally recharged to the underground superficial sanding belt water storage layer through the road bricks slits by passing through the hole, and then is slowly penetrated to an underground deep sanding belt water storage layer.
Hard road construction method by naturally recharging underground water
ZHOU TAIZE (Autor:in)
19.08.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Construction method for recharging fresh water in river into underground reservoir
Europäisches Patentamt | 2020
|Foundation pit gushing water drainage and recharging construction method
Europäisches Patentamt | 2021
|Approach towards Water Harvesting and Recharging in Hard Rock Area
Europäisches Patentamt | 2021
|