Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for rebuilding building above super shallow-buried tunnel
The invention relates to a construction method for rebuilding a building above a super-shallow-buried tunnel. The construction method includes the following steps that A, after a body structure of the tunnel is constructed, supporting foundations are constructed on bed rock at the two sides outside a tunnel excavation contour line, and the distance between each supporting foundation and the tunnel contour line is over five times larger than the span length of a tunnel hole; B, piers are arranged on the supporting foundations at the two sides; C, a beam body is put up on the piers at the two sides, and a simply supported bridge structure mode is formed by the beam body and the piers at the two sides; D, the building to be rebuilt is rebuilt on the beam body. According to the construction method, the supporting foundations, the piers and the beam body are used for forming a simply supported bridge, the simply supported bridge structure mode is adopted to span a tunnel lining structure, then the building is rebuilt on the simply supported bridge, and therefore it is avoided when a foundation of the rebuilt building is directly located over the tunnel, the safety and durability of the tunnel lining structure are affected negatively.
Construction method for rebuilding building above super shallow-buried tunnel
The invention relates to a construction method for rebuilding a building above a super-shallow-buried tunnel. The construction method includes the following steps that A, after a body structure of the tunnel is constructed, supporting foundations are constructed on bed rock at the two sides outside a tunnel excavation contour line, and the distance between each supporting foundation and the tunnel contour line is over five times larger than the span length of a tunnel hole; B, piers are arranged on the supporting foundations at the two sides; C, a beam body is put up on the piers at the two sides, and a simply supported bridge structure mode is formed by the beam body and the piers at the two sides; D, the building to be rebuilt is rebuilt on the beam body. According to the construction method, the supporting foundations, the piers and the beam body are used for forming a simply supported bridge, the simply supported bridge structure mode is adopted to span a tunnel lining structure, then the building is rebuilt on the simply supported bridge, and therefore it is avoided when a foundation of the rebuilt building is directly located over the tunnel, the safety and durability of the tunnel lining structure are affected negatively.
Construction method for rebuilding building above super shallow-buried tunnel
SHA QUANXIAN (Autor:in) / NIU ZELIN (Autor:in) / SONG ZHANPING (Autor:in)
19.08.2015
Patent
Elektronische Ressource
Englisch
Foundation pit structure above shallow-buried subway tunnel and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Method for treating foundation above shallow-buried shield tunnel through vacuum preloading
Europäisches Patentamt | 2021
|Shallow-buried small-spacing rock-soil tunnel construction method
Europäisches Patentamt | 2024
|