Deeply-buried pool construction method for gridded underground continuous-wall foundation pit support
The invention discloses a deeply-buried pool construction method for a gridded underground continuous-wall foundation pit support. The method includes construction of a gridded underground continuous wall and a deeply-buried pool structure, and is characterized in that a deeply-buried pool takes the gridded underground continuous wall as a lateral force resistant soil retaining structure, and vertical earth excavation of an inner-support free structure is performed in the foundation pit support formed by the gridded underground continuous wall. The construction method specially includes the steps of building of the underground continuous wall and construction of the main pool structure. Compared with the prior art, the deeply-buried pool construction method has the advantages that the construction process is simple, progress of the construction is fast, construction waste caused by subsequent dismantling of a temporary foundation pit structure is avoided, energy conservation and emission reduction are achieved, the process is green and environment friendly, and the method is especially suitable for construction of pool structures with soft layers deeply buried by less than 15 meters.
Deeply-buried pool construction method for gridded underground continuous-wall foundation pit support
The invention discloses a deeply-buried pool construction method for a gridded underground continuous-wall foundation pit support. The method includes construction of a gridded underground continuous wall and a deeply-buried pool structure, and is characterized in that a deeply-buried pool takes the gridded underground continuous wall as a lateral force resistant soil retaining structure, and vertical earth excavation of an inner-support free structure is performed in the foundation pit support formed by the gridded underground continuous wall. The construction method specially includes the steps of building of the underground continuous wall and construction of the main pool structure. Compared with the prior art, the deeply-buried pool construction method has the advantages that the construction process is simple, progress of the construction is fast, construction waste caused by subsequent dismantling of a temporary foundation pit structure is avoided, energy conservation and emission reduction are achieved, the process is green and environment friendly, and the method is especially suitable for construction of pool structures with soft layers deeply buried by less than 15 meters.
Deeply-buried pool construction method for gridded underground continuous-wall foundation pit support
LI HUAMEI (Autor:in) / TIAN BAYUAN (Autor:in) / WU HAO (Autor:in) / YU BINWEN (Autor:in) / FU XIAOYUN (Autor:in) / JIN GUOLONG (Autor:in) / XU JIAN (Autor:in) / LIN JING (Autor:in) / TIAN ZHEN (Autor:in)
19.08.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation Engineering in Deeply Buried Karst
British Library Conference Proceedings | 1989
|Construction method for crossing obstacles on deeply-buried underground comprehensive pipe gallery
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Shallow buried rock stratum section underground continuous wall grooving construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|