Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for preventing preformed pile in mucky soil layer from moving horizontally
The invention discloses a construction method for preventing a preformed pile in a mucky soil layer from moving horizontally. According to the method, a pile body is lengthened and is longer than mucky silty clay layers; the two ends of the pile body are fixed in the first silty clay layer and the second silty clay layer respectively, and the second silty clay layer is paved with miscellaneous fill. The construction method for preventing the preformed pile in the mucky soil layer from moving horizontally well resolves the problem that a pile body in a mucky soil layer inclines and moves, is easy to implement and good in control quality and well guarantees pile forming quality.
Construction method for preventing preformed pile in mucky soil layer from moving horizontally
The invention discloses a construction method for preventing a preformed pile in a mucky soil layer from moving horizontally. According to the method, a pile body is lengthened and is longer than mucky silty clay layers; the two ends of the pile body are fixed in the first silty clay layer and the second silty clay layer respectively, and the second silty clay layer is paved with miscellaneous fill. The construction method for preventing the preformed pile in the mucky soil layer from moving horizontally well resolves the problem that a pile body in a mucky soil layer inclines and moves, is easy to implement and good in control quality and well guarantees pile forming quality.
Construction method for preventing preformed pile in mucky soil layer from moving horizontally
ZHU XIAOJUN (Autor:in)
02.09.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for mucky soft soil roadbase tubular pile
Europäisches Patentamt | 2015
|Construction method for reinforcing PHC pipe pile core in mucky soil layer area
Europäisches Patentamt | 2021
|Foundation pit reinforcement construction method for mucky soil layer
Europäisches Patentamt | 2022
|Pile casing device for brine stratum mucky soil cast-in-place pile construction
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|