Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof
The invention relates to a piping blocking structure outside the deep foundation pit underground diaphragm wall and a grouting treatment method of the piping blocking structure. The blocking structure comprises the underground diaphragm wall, a water leakage point, a blocking steel plate and a diversion steel pipe. The blocking steel plate is pasted on the underground diaphragm wall surface, the four angles of the blocking steel plate are fixed on the underground diaphragm wall through expansion bolts, the water leakage point directly faces to the diversion steel pipe, the diversion steel pipe is provided with a valve, and edge sealing is conducted along the gap between the blocking steel plate and the underground diaphragm wall surface through the edge sealing materials. The grouting treatment method includes: chisel and clear up the water leakage point, insert the diversion pipe, fix the blocking steel plate, smear the edge sealing materials, close the valve and conduct grouting outside the underground diaphragm wall. The piping blocking structure outside the deep foundation pit underground diaphragm wall and the grouting treatment method can ensure the foundation pit engineering is conducted smoothly and the blocking and treatment can be conducted in time when piping occurs outside the diaphragm wall, guarantees the personal and property safety of construction personnel, and provides necessary technical support for smooth construction.
Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof
The invention relates to a piping blocking structure outside the deep foundation pit underground diaphragm wall and a grouting treatment method of the piping blocking structure. The blocking structure comprises the underground diaphragm wall, a water leakage point, a blocking steel plate and a diversion steel pipe. The blocking steel plate is pasted on the underground diaphragm wall surface, the four angles of the blocking steel plate are fixed on the underground diaphragm wall through expansion bolts, the water leakage point directly faces to the diversion steel pipe, the diversion steel pipe is provided with a valve, and edge sealing is conducted along the gap between the blocking steel plate and the underground diaphragm wall surface through the edge sealing materials. The grouting treatment method includes: chisel and clear up the water leakage point, insert the diversion pipe, fix the blocking steel plate, smear the edge sealing materials, close the valve and conduct grouting outside the underground diaphragm wall. The piping blocking structure outside the deep foundation pit underground diaphragm wall and the grouting treatment method can ensure the foundation pit engineering is conducted smoothly and the blocking and treatment can be conducted in time when piping occurs outside the diaphragm wall, guarantees the personal and property safety of construction personnel, and provides necessary technical support for smooth construction.
Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof
XUAN YUNGAN (Autor:in)
09.09.2015
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2015
|Underground diaphragm wall composite grouting method and grouting structure
Europäisches Patentamt | 2021
|Piping repairing device and method for underground diaphragm wall of deep foundation pit
Europäisches Patentamt | 2024
|Novel grouting device for underground diaphragm wall joints
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2015
|