Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Soil filling construction method for slope land water balance test
The invention relates to a soil filling construction method for a slope land water balance test. The method comprises the following steps of a, selecting a test soil sample, and excavating the test soil sample in layers; b, heaping the soil sample in layers; c, preserving moisture, and making uniform the moisture content of the soil sample; d, performing a compaction test; e, performing a rolling compaction test; f, measuring the original moisture content of the soil sample; g, back-filling the soil sample strictly according to dry density; h, ensuring uniformity in the thickness of the back-filled soil; i, compacting the back-filled soil; j, verifying the back-filled soil. The construction method is reasonable in construction design and easy to operate, the back-filled soil of a slope land test plot can be ensured to be close to natural soil, consistency between the filled soil and an actual slope land soil structure is also ensured, and a construction reference is provided for the soil filling of plot construction in other related tests.
Soil filling construction method for slope land water balance test
The invention relates to a soil filling construction method for a slope land water balance test. The method comprises the following steps of a, selecting a test soil sample, and excavating the test soil sample in layers; b, heaping the soil sample in layers; c, preserving moisture, and making uniform the moisture content of the soil sample; d, performing a compaction test; e, performing a rolling compaction test; f, measuring the original moisture content of the soil sample; g, back-filling the soil sample strictly according to dry density; h, ensuring uniformity in the thickness of the back-filled soil; i, compacting the back-filled soil; j, verifying the back-filled soil. The construction method is reasonable in construction design and easy to operate, the back-filled soil of a slope land test plot can be ensured to be close to natural soil, consistency between the filled soil and an actual slope land soil structure is also ensured, and a construction reference is provided for the soil filling of plot construction in other related tests.
Soil filling construction method for slope land water balance test
XIE SONGHUA (Autor:in) / CHEN XIAOAN (Autor:in) / YANG JIE (Autor:in) / GONG LAIHONG (Autor:in) / WANG FUQING (Autor:in) / XIONG YONG (Autor:in)
16.09.2015
Patent
Elektronische Ressource
Englisch
Half-slope pile supporting structure construction method for slope filling
Europäisches Patentamt | 2023
|Rock slope filling closed protection and construction method
Europäisches Patentamt | 2020
|Slope land water and soil loss comprehensive treatment method
Europäisches Patentamt | 2024
|