Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a construction method for an offshore steel trestle. The construction method includes the first step of positioning of a buoyancy tank platform, the second step of distribution of foundation steel tubular piles, the third step of pavement of a primary Bailey truss and the fourth step of bridge deck pavement. The construction method for the offshore steel trestle is fast in construction progress, and the steel tubular piles are positioned accurately.
The invention discloses a construction method for an offshore steel trestle. The construction method includes the first step of positioning of a buoyancy tank platform, the second step of distribution of foundation steel tubular piles, the third step of pavement of a primary Bailey truss and the fourth step of bridge deck pavement. The construction method for the offshore steel trestle is fast in construction progress, and the steel tubular piles are positioned accurately.
Offshore steel trestle guide hole construction method
Europäisches Patentamt | 2023
|Fabricated steel trestle structure and steel trestle construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|