Prefabricated gutter inlet and construction method thereof
The invention relates to the technical field of construction, and provides a prefabricated gutter inlet and a construction method thereof. A third well bore module of the prefabricated gutter inlet comprises a pedestal module and an adjusting module, and therefore the well bore can be modularized according to the road construction demand, the construction of the gutter inlet and the construction of the road structure can be carried out in a layered manner, the case that people need to wait until building block mortar or cast-in-site cement concrete reaches the construction intensity is avoided, and therefore the construction time is shortened, and the prefabricated gutter inlet especially meets the requirement that the town road needs to be opened quickly; in addition, each road structural layer is without repairing joints, a large machine is employed for the construction, and therefore the construction quality of the road is improved; finally, the case that the road needs to be excavated for many times, then is repaired through backfill is not needed, and thereof waste of materials can be avoided.
Prefabricated gutter inlet and construction method thereof
The invention relates to the technical field of construction, and provides a prefabricated gutter inlet and a construction method thereof. A third well bore module of the prefabricated gutter inlet comprises a pedestal module and an adjusting module, and therefore the well bore can be modularized according to the road construction demand, the construction of the gutter inlet and the construction of the road structure can be carried out in a layered manner, the case that people need to wait until building block mortar or cast-in-site cement concrete reaches the construction intensity is avoided, and therefore the construction time is shortened, and the prefabricated gutter inlet especially meets the requirement that the town road needs to be opened quickly; in addition, each road structural layer is without repairing joints, a large machine is employed for the construction, and therefore the construction quality of the road is improved; finally, the case that the road needs to be excavated for many times, then is repaired through backfill is not needed, and thereof waste of materials can be avoided.
Prefabricated gutter inlet and construction method thereof
HU SHIJIN (Autor:in) / REN LIMING (Autor:in) / WANG FENGPING (Autor:in) / LU YINGDONG (Autor:in) / SUO PEI (Autor:in) / ZHAI JIA (Autor:in) / GAO YANYAN (Autor:in) / LI JING (Autor:in)
28.10.2015
Patent
Elektronische Ressource
Englisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Prefabricated gutter inlet and construction method thereof
Europäisches Patentamt | 2020
|Prefabricated assembly type gutter inlet and construction method thereof
Europäisches Patentamt | 2023
|Fabricated combined gutter inlet and construction method thereof
Europäisches Patentamt | 2022
|Multifunctional fabricated gutter inlet and construction method thereof
Europäisches Patentamt | 2021
|