Kerb drainage system and kerb drainage method for transformer substation
The invention relates to a kerb drainage system and a kerb drainage method for a transformer substation. According to the technical scheme, the kerb drainage system comprises a plurality of base bodies, wherein the base bodies consist of resin concrete, and are sequentially connected to one another end to end; the front end surface of each base body is connected with the top of the base body through an arc-shaped connector; each arc-shaped connector is provided with three water feeding holes; drainage channels are horizontally formed in middles of the insides of the base bodies; the water inlet holes are connected with the drainage channels; each water inlet hole is provided with a filtering net; one end of each base body is provided with a bayonet; the other end of each base body is provided with a slot; and each two base bodies are connected with each other by matching the corresponding bayonet and the corresponding slot. The kerb drainage system can be built while kerb is built, workload of a construction unit is reduced, excavation frequency is reduced, occupied area is also reduced, rainwater can be drained out of the transformer substation as soon as possible, and possibility of ponding of the transformer substation is reduced.
Kerb drainage system and kerb drainage method for transformer substation
The invention relates to a kerb drainage system and a kerb drainage method for a transformer substation. According to the technical scheme, the kerb drainage system comprises a plurality of base bodies, wherein the base bodies consist of resin concrete, and are sequentially connected to one another end to end; the front end surface of each base body is connected with the top of the base body through an arc-shaped connector; each arc-shaped connector is provided with three water feeding holes; drainage channels are horizontally formed in middles of the insides of the base bodies; the water inlet holes are connected with the drainage channels; each water inlet hole is provided with a filtering net; one end of each base body is provided with a bayonet; the other end of each base body is provided with a slot; and each two base bodies are connected with each other by matching the corresponding bayonet and the corresponding slot. The kerb drainage system can be built while kerb is built, workload of a construction unit is reduced, excavation frequency is reduced, occupied area is also reduced, rainwater can be drained out of the transformer substation as soon as possible, and possibility of ponding of the transformer substation is reduced.
Kerb drainage system and kerb drainage method for transformer substation
ZHANG WU (Autor:in) / GU XIAOCAI (Autor:in) / CHU MINGKUN (Autor:in) / XIE YUNXING (Autor:in) / LIU NAN (Autor:in)
18.11.2015
Patent
Elektronische Ressource
Englisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
KERB DRAINAGE SYSTEM AND METHOD OF INSTALLING A KERB DRAINAGE SYSTEM
Europäisches Patentamt | 2019
|Kerb of assembled self-drainage asphalt pavement and construction method of kerb