Method for paving broken stone diversion layer of refuse landfill
The invention discloses a method for paving a broken stone diversion layer of a refuse landfill. The method comprises: transporting broken stones through a fish-bone shaped operation road (1), stacking the broken stones on planning point locations (3), one planning point location (3) being arranged in each 15-25 square meter range; paving the broken stones to the periphery with the broken stone pile as the center, to greatly reduce damage rate of a HDPE film in a broken stone paving process; performing mesh generation on the bottom of a reservoir area, in a broken stone paving process, using surveyor's poles arranged on grid nodes (4) to measure thickness of the broken stone diversion layer, the surveyor's poles being provided with mark points on the positions of design thickness of the broken stone diversion layer, connecting the mark points on the surveyor's poles by building threads or bright-colored nylon wires, to observe whether the thickness of the broken stone diversion layer satisfies requirement and whether the broken stone diversion layer is paved uniformly; and raking the paved broken stone level integrally so that the broken stone diversion layer is more uniform.
Method for paving broken stone diversion layer of refuse landfill
The invention discloses a method for paving a broken stone diversion layer of a refuse landfill. The method comprises: transporting broken stones through a fish-bone shaped operation road (1), stacking the broken stones on planning point locations (3), one planning point location (3) being arranged in each 15-25 square meter range; paving the broken stones to the periphery with the broken stone pile as the center, to greatly reduce damage rate of a HDPE film in a broken stone paving process; performing mesh generation on the bottom of a reservoir area, in a broken stone paving process, using surveyor's poles arranged on grid nodes (4) to measure thickness of the broken stone diversion layer, the surveyor's poles being provided with mark points on the positions of design thickness of the broken stone diversion layer, connecting the mark points on the surveyor's poles by building threads or bright-colored nylon wires, to observe whether the thickness of the broken stone diversion layer satisfies requirement and whether the broken stone diversion layer is paved uniformly; and raking the paved broken stone level integrally so that the broken stone diversion layer is more uniform.
Method for paving broken stone diversion layer of refuse landfill
XU KUI (Autor:in) / XU YUBIAO (Autor:in) / SHU JING (Autor:in) / GUO JIANLIN (Autor:in) / XIAO GUANGTING (Autor:in) / JIANG DASHUI (Autor:in)
25.11.2015
Patent
Elektronische Ressource
Englisch
Rainwater and sewage diversion structure for refuse landfill
Europäisches Patentamt | 2024
|Rain and sewage diversion device and method for refuse landfill
Europäisches Patentamt | 2022
|Graded broken stone paving device for road reconstruction roadbed
Europäisches Patentamt | 2024
|STONE PAVING CONSTRUCTION METHOD, STONE PAVING PARTS MANUFACTURING METHOD, AND STONE PAVING PARTS
Europäisches Patentamt | 2018
|