Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Waste treatment passage for high-rise building construction and construction method for waste treatment passage
The invention discloses a waste treatment passage for high-rise building construction and a construction method for the waste treatment passage. The waste treatment passage comprises an air shaft (1) arranged by the aid of a shear wall (2). A retaining plate (6) is arranged at each floor of a building on one side of the air shaft (1). The retaining plates (6) and the shear wall (2) enclose a vertical waste passage. A discharge bucket (7) inclining down is arranged on each retaining plate (6). A residue collection tank (4) is arranged at the bottom end of the air shaft (1). A lower end port of the residue collection tank (4) is communicated with the ground through a slide. The waste treatment passage is convenient to mount and quickly implement and replaces an elevator-based waste transporting method used in existing high-rise building construction, so that construction cost and construction period can be saved; the whole passage is a closed passage, thus raised dust and noise generated in waste treatment is effectively avoided and green construction is achieved.
Waste treatment passage for high-rise building construction and construction method for waste treatment passage
The invention discloses a waste treatment passage for high-rise building construction and a construction method for the waste treatment passage. The waste treatment passage comprises an air shaft (1) arranged by the aid of a shear wall (2). A retaining plate (6) is arranged at each floor of a building on one side of the air shaft (1). The retaining plates (6) and the shear wall (2) enclose a vertical waste passage. A discharge bucket (7) inclining down is arranged on each retaining plate (6). A residue collection tank (4) is arranged at the bottom end of the air shaft (1). A lower end port of the residue collection tank (4) is communicated with the ground through a slide. The waste treatment passage is convenient to mount and quickly implement and replaces an elevator-based waste transporting method used in existing high-rise building construction, so that construction cost and construction period can be saved; the whole passage is a closed passage, thus raised dust and noise generated in waste treatment is effectively avoided and green construction is achieved.
Waste treatment passage for high-rise building construction and construction method for waste treatment passage
LI NAN (Autor:in) / DING NINGBO (Autor:in) / YANG GUANGHAI (Autor:in)
23.12.2015
Patent
Elektronische Ressource
Englisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
High-rise building waste rapid treatment system and construction method thereof
Europäisches Patentamt | 2022
|Construction waste clearing device in high-rise building construction
Europäisches Patentamt | 2020
|