Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Microporous construction method for anchoring articles on keel gypsum board partition finished
The invention discloses a microporous construction method for anchoring articles on a keel gypsum board partition finished. The microporous construction method includes the following steps: 1), on the gypsum board partition where facing is completed, determining a screw fixing position used for anchoring a newly added article, and using an electric drill to drill a positioning hole, matched with a plastic expansion pipe in outer diameter, in the fixing position; 2), injecting a polyurethane foam joint mixture into the positioning hole in an aligned manner; 3), using the electric drill to bore a tubular hole with inner large and outer small in a foamed plastic plate on the inner side of the positioning hole; 4), filling cement slurry which is prepared in advance into the tubular hole, and inserting the plastic expansion pipe for solidification; 5), after the cement slurry is solidified, screwing a screw to realize anchoring. According to the construction method, only a microporous wound surface equivalent to a screw cap in size needs to be formed, original wall facing is not damaged, and screw anchoring can be realized.
Microporous construction method for anchoring articles on keel gypsum board partition finished
The invention discloses a microporous construction method for anchoring articles on a keel gypsum board partition finished. The microporous construction method includes the following steps: 1), on the gypsum board partition where facing is completed, determining a screw fixing position used for anchoring a newly added article, and using an electric drill to drill a positioning hole, matched with a plastic expansion pipe in outer diameter, in the fixing position; 2), injecting a polyurethane foam joint mixture into the positioning hole in an aligned manner; 3), using the electric drill to bore a tubular hole with inner large and outer small in a foamed plastic plate on the inner side of the positioning hole; 4), filling cement slurry which is prepared in advance into the tubular hole, and inserting the plastic expansion pipe for solidification; 5), after the cement slurry is solidified, screwing a screw to realize anchoring. According to the construction method, only a microporous wound surface equivalent to a screw cap in size needs to be formed, original wall facing is not damaged, and screw anchoring can be realized.
Microporous construction method for anchoring articles on keel gypsum board partition finished
XU GUOQUAN (Autor:in) / LIANG WEIMING (Autor:in)
06.01.2016
Patent
Elektronische Ressource
Englisch
Light steel keel gypsum plaster board partition wall and construction method
Europäisches Patentamt | 2020
|Construction method of light steel keel gypsum board suspended ceiling
Europäisches Patentamt | 2022
|Light steel keel gypsum board suspended ceiling construction process
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Green construction method for light steel keel gypsum plaster board
Europäisches Patentamt | 2021
|