Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
General construction method for partially ground-anchored cable-stayed suspension bridge
The invention discloses a general construction method for a partially ground-anchored cable-stayed suspension bridge, which belongs to the technical field of bridge construction. According to general construction method for the partially ground-anchored cable-stayed suspension bridge, a cable-stayed area girder section and a suspension area girder section of the cable-stayed suspension bridge are simultaneously erected and constructed; before the construction of the cable-stayed suspension bridge, a reasonable completed bridge state of the cable-stayed suspension bridge is determined by using a reasonable completed bridge state determining method which takes stiffness distribution into consideration; and during the construction of the cable-stayed suspension bridge, the closing of a cable-stayed area girder section girder and a suspension area girder section girder is finished by using a closing method for the cable-stayed suspension bridge. As the cable-stayed suspension bridge is erected by using the general construction method disclosed by the invention, the girder erecting speed can be effectively increased, a problem that solidified parts formed after a pylon and girder temporarily solidifies bears a greater horizontal force can be avoided, the construction period is greatly reduced and the construction strength is reduced.
General construction method for partially ground-anchored cable-stayed suspension bridge
The invention discloses a general construction method for a partially ground-anchored cable-stayed suspension bridge, which belongs to the technical field of bridge construction. According to general construction method for the partially ground-anchored cable-stayed suspension bridge, a cable-stayed area girder section and a suspension area girder section of the cable-stayed suspension bridge are simultaneously erected and constructed; before the construction of the cable-stayed suspension bridge, a reasonable completed bridge state of the cable-stayed suspension bridge is determined by using a reasonable completed bridge state determining method which takes stiffness distribution into consideration; and during the construction of the cable-stayed suspension bridge, the closing of a cable-stayed area girder section girder and a suspension area girder section girder is finished by using a closing method for the cable-stayed suspension bridge. As the cable-stayed suspension bridge is erected by using the general construction method disclosed by the invention, the girder erecting speed can be effectively increased, a problem that solidified parts formed after a pylon and girder temporarily solidifies bears a greater horizontal force can be avoided, the construction period is greatly reduced and the construction strength is reduced.
General construction method for partially ground-anchored cable-stayed suspension bridge
ZHANG YONGTAO (Autor:in) / CHEN MING (Autor:in) / YOU XINPENG (Autor:in) / PENG CHENGMING (Autor:in) / HUANG CAN (Autor:in) / PAN GUILIN (Autor:in) / CHEN SHAOLIN (Autor:in)
27.01.2016
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
Jianshe Self-Anchored Cable-Stayed-Suspension Bridge, China
Online Contents | 2010
|Jianshe Self-Anchored Cable-Stayed-Suspension Bridge, China
British Library Online Contents | 2010
|NEW BRIDGE STRUCTURE-SELF-ANCHORED CABLE-STAYED SUSPENSION COMBINED BRIDGE
British Library Conference Proceedings | 2007
|Seismic Response of Partially Earth-anchored Cable-Stayed Bridge
British Library Conference Proceedings | 1999
|Applicability of Partially Anchored Cable-Stayed Bridge to Long-Span Bridge
British Library Online Contents | 1995
|