Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Underground pipe gallery fender wall construction method and underground pipe gallery construction method
The invention belongs to the technical field of buildings, and relates to an underground pipe gallery fender wall construction method and an underground pipe gallery construction method. The underground pipe gallery fender wall construction method comprises the steps that A, positioning is conducted, i.e., corresponding pile driving lines are drawn on the ground and the two sides of an underground pipe gallery to be installed according to the size and direction of the underground pipe gallery to be installed; B, pile driving is conducted, cement stirring piles are driven in the soil layer according to the drawn pile driving lines and are connected along the pile driving lines to form two cement stirring pile walls oppositely arranged; and C, a trench used for containing the underground pipe gallery is dug in a cofferdam and between the two prefabricated pile walls, and the underground pipe gallery is put into the trench. The firmness is high, and the structural intensity is good.
Underground pipe gallery fender wall construction method and underground pipe gallery construction method
The invention belongs to the technical field of buildings, and relates to an underground pipe gallery fender wall construction method and an underground pipe gallery construction method. The underground pipe gallery fender wall construction method comprises the steps that A, positioning is conducted, i.e., corresponding pile driving lines are drawn on the ground and the two sides of an underground pipe gallery to be installed according to the size and direction of the underground pipe gallery to be installed; B, pile driving is conducted, cement stirring piles are driven in the soil layer according to the drawn pile driving lines and are connected along the pile driving lines to form two cement stirring pile walls oppositely arranged; and C, a trench used for containing the underground pipe gallery is dug in a cofferdam and between the two prefabricated pile walls, and the underground pipe gallery is put into the trench. The firmness is high, and the structural intensity is good.
Underground pipe gallery fender wall construction method and underground pipe gallery construction method
ZHOU ZHAODI (Autor:in)
24.02.2016
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underground pipe gallery construction equipment and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Underground pipe gallery construction protection device
Europäisches Patentamt | 2024
|Construction technology for underground pipe gallery construction
Europäisches Patentamt | 2023
|