Frozen soil area anti-melting test method and system
The invention provides a frozen soil area anti-melting test method and system. The method comprises the following steps of selecting a section, wherein an experimental road section is selected from ato-be-constructed road section, and remaining sections of the to-be-constructed road section are marked as working road sections; modeling, wherein temperature and sinking data of the experimental road section are obtained, and a temperature and sinking data model is established; obtaining, wherein actual environment temperature of the working road sections is obtained; and determining, wherein the sinking phenomenon of the working road sections and a heat preservation construction scheme of the to-be-constructed road section are determined according to the actual environment temperature of the working road sections and the temperature and sinking data model. By means of the frozen soil area anti-melting test method and system, melting and sinking analysis of the frozen soil area to-be-constructed road section is realized, the heat preservation construction scheme of the to-be-constructed road section is conveniently determined, it is ensured that the determined heat preservation construction scheme can be accurately adapted to the actual condition of the to-be-constructed road section, a test data foundation is provided for building construction of a frozen soil area, building construction is assisted, and the construction quality is improved.
本发明提供了一种冻土区防融化试验方法及系统,该方法包括如下步骤:选段步骤,从待施工路段中选择一段实验路段;其中,待施工路段剩余的路段记为作业路段;建模步骤,获取实验路段的温度和下沉数据,并建立温度与下沉数据模型;获取步骤,获取作业路段的实际环境温度;确定步骤,根据作业路段的实际环境温度以及温度与下沉数据模型确定作业路段的下沉现象和待施工路段的保温施工方案。本发明实现了对冻土区待施工路段的融化下沉分析,便于确定待施工路段的保温施工方案,并保证确定出的保温施工方案能够准确地适应于待施工路段的实际情况,为冻土区的建筑施工提供了试验数据基础,辅助建筑施工,提高了施工质量。
Frozen soil area anti-melting test method and system
The invention provides a frozen soil area anti-melting test method and system. The method comprises the following steps of selecting a section, wherein an experimental road section is selected from ato-be-constructed road section, and remaining sections of the to-be-constructed road section are marked as working road sections; modeling, wherein temperature and sinking data of the experimental road section are obtained, and a temperature and sinking data model is established; obtaining, wherein actual environment temperature of the working road sections is obtained; and determining, wherein the sinking phenomenon of the working road sections and a heat preservation construction scheme of the to-be-constructed road section are determined according to the actual environment temperature of the working road sections and the temperature and sinking data model. By means of the frozen soil area anti-melting test method and system, melting and sinking analysis of the frozen soil area to-be-constructed road section is realized, the heat preservation construction scheme of the to-be-constructed road section is conveniently determined, it is ensured that the determined heat preservation construction scheme can be accurately adapted to the actual condition of the to-be-constructed road section, a test data foundation is provided for building construction of a frozen soil area, building construction is assisted, and the construction quality is improved.
本发明提供了一种冻土区防融化试验方法及系统,该方法包括如下步骤:选段步骤,从待施工路段中选择一段实验路段;其中,待施工路段剩余的路段记为作业路段;建模步骤,获取实验路段的温度和下沉数据,并建立温度与下沉数据模型;获取步骤,获取作业路段的实际环境温度;确定步骤,根据作业路段的实际环境温度以及温度与下沉数据模型确定作业路段的下沉现象和待施工路段的保温施工方案。本发明实现了对冻土区待施工路段的融化下沉分析,便于确定待施工路段的保温施工方案,并保证确定出的保温施工方案能够准确地适应于待施工路段的实际情况,为冻土区的建筑施工提供了试验数据基础,辅助建筑施工,提高了施工质量。
Frozen soil area anti-melting test method and system
冻土区防融化试验方法及系统
ZHANG HUA (Autor:in) / CHEN SHIWEI (Autor:in)
17.04.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Anti-settlement system for roadbed in frozen soil area
Europäisches Patentamt | 2023
|Seasonally frozen soil area roadbed anti-freezing structure and construction method thereof
Europäisches Patentamt | 2020
|Frozen soil monitoring method for concrete covering site in seasonal frozen soil area
Europäisches Patentamt | 2024
|Method and device for solving melting problem of frozen soil
Europäisches Patentamt | 2021
|