Concrete rainwater pipe connector construction process
The invention discloses a concrete rainwater pipe connector construction process. An arc-shaped connector support is additionally arranged. A central line of the rainwater pipe is popped up on a concrete foundation in advance, then the position of each pipe joint connector is determined, the connector support is fixed on a concrete base at the position of the rainwater pipe joint, a layer of cement mortar is smeared on the contact face of the connector support and the pipe joint, and finally the pipe joint is hung on the front support and the rear support and fixed through concrete. The connector support is adopted for rapid positioning, the position adjusting time in the pipe discharging process is effectively shortened, the defect of pipe joint linear deviation is overcome, the connectorquality is guaranteed and the construction quality of the rainwater pipe is guaranteed.
本发明公开了一种混凝土雨水管接头施工工艺,增加了弧形的接头支架;预先在混凝土基础上弹出雨水管中线,然后确定每个管节接头的位置,将接头支架固定在雨水管接头处的混凝土基座上,在接头支架与管节的接触面上抹上一层水泥砂浆,最后将管节吊放到前后两个支架上,用混凝土固定住。本发明采用接头支架来快速定位,有效的减少了下管过程的中的位置调整时间,消除了管节线性偏移的缺陷,保证了接头质量,使雨水管的施工质量得到了保证。
Concrete rainwater pipe connector construction process
The invention discloses a concrete rainwater pipe connector construction process. An arc-shaped connector support is additionally arranged. A central line of the rainwater pipe is popped up on a concrete foundation in advance, then the position of each pipe joint connector is determined, the connector support is fixed on a concrete base at the position of the rainwater pipe joint, a layer of cement mortar is smeared on the contact face of the connector support and the pipe joint, and finally the pipe joint is hung on the front support and the rear support and fixed through concrete. The connector support is adopted for rapid positioning, the position adjusting time in the pipe discharging process is effectively shortened, the defect of pipe joint linear deviation is overcome, the connectorquality is guaranteed and the construction quality of the rainwater pipe is guaranteed.
本发明公开了一种混凝土雨水管接头施工工艺,增加了弧形的接头支架;预先在混凝土基础上弹出雨水管中线,然后确定每个管节接头的位置,将接头支架固定在雨水管接头处的混凝土基座上,在接头支架与管节的接触面上抹上一层水泥砂浆,最后将管节吊放到前后两个支架上,用混凝土固定住。本发明采用接头支架来快速定位,有效的减少了下管过程的中的位置调整时间,消除了管节线性偏移的缺陷,保证了接头质量,使雨水管的施工质量得到了保证。
Concrete rainwater pipe connector construction process
一种混凝土雨水管接头施工工艺
ZHAO JIANHUA (Autor:in) / SHEN JIANHONG (Autor:in) / XIA DONG (Autor:in)
17.04.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Construction method of prefabricated concrete socket rainwater pipe
Europäisches Patentamt | 2022
|Rainwater pipe structure and construction method thereof