Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile foundation intelligent perfusion device and construction method
The invention belongs to the technical field of bridge construction, and particularly relates to a pile foundation intelligent perfusion device and a construction method. The problems that during pilefoundation perfusion, the man-made influence is large, uncontrollable factors are many, concrete perfusion can only be obtained through measuring and calculating, the result is not visual, operatorshigh in technological level can be qualified for perfusion construction, and the man-made subjective affect on the pile foundation perfusion quality is large are solved. A guide pipe supporting and power system installed on a cave entrance is included, and is provided with a perfusion funnel capable of rising and falling up and down along the guide pipe supporting and power system; the lower end of the perfusion funnel is sequentially connected with a plurality of segments of middle perfusion guide pipes, a tail III perfusion guide pipe, a tail II perfusion guide pipe and a tail I perfusion guide pipe; the tail III perfusion guide pipe, the tail II perfusion guide pipe and the tail I perfusion guide pipe are provided with a plurality of sets of pressure detecting systems; and the guide pipe supporting and power system and a pressure detecting systems are electrically connected with a control system.
本发明属于桥梁施工技术领域,具体是一种桩基智能灌注装置及施工方法。解决桩基灌注时存在人为影响较大、不可控因素多、混凝土灌注只能通过测量及计算得到,结果不直观、灌注施工需要较高技术水平的作业人员方可胜任、桩基灌注质量受人为主观影响大等问题,包括安装在洞口的导管支撑及动力系统,导管支撑及动力系统上安装有可以沿其上下升降的灌注漏斗,灌注漏斗下端依次与若干节中间灌注导管、尾III灌注导管、尾II灌注导管以及尾I灌注导管连接,尾III灌注导管、尾II灌注导管以及尾I灌注导管上安装有若干套压力检测系统,导管支撑及动力系统以及压力检测系统分别与控制系统电连接。
Pile foundation intelligent perfusion device and construction method
The invention belongs to the technical field of bridge construction, and particularly relates to a pile foundation intelligent perfusion device and a construction method. The problems that during pilefoundation perfusion, the man-made influence is large, uncontrollable factors are many, concrete perfusion can only be obtained through measuring and calculating, the result is not visual, operatorshigh in technological level can be qualified for perfusion construction, and the man-made subjective affect on the pile foundation perfusion quality is large are solved. A guide pipe supporting and power system installed on a cave entrance is included, and is provided with a perfusion funnel capable of rising and falling up and down along the guide pipe supporting and power system; the lower end of the perfusion funnel is sequentially connected with a plurality of segments of middle perfusion guide pipes, a tail III perfusion guide pipe, a tail II perfusion guide pipe and a tail I perfusion guide pipe; the tail III perfusion guide pipe, the tail II perfusion guide pipe and the tail I perfusion guide pipe are provided with a plurality of sets of pressure detecting systems; and the guide pipe supporting and power system and a pressure detecting systems are electrically connected with a control system.
本发明属于桥梁施工技术领域,具体是一种桩基智能灌注装置及施工方法。解决桩基灌注时存在人为影响较大、不可控因素多、混凝土灌注只能通过测量及计算得到,结果不直观、灌注施工需要较高技术水平的作业人员方可胜任、桩基灌注质量受人为主观影响大等问题,包括安装在洞口的导管支撑及动力系统,导管支撑及动力系统上安装有可以沿其上下升降的灌注漏斗,灌注漏斗下端依次与若干节中间灌注导管、尾III灌注导管、尾II灌注导管以及尾I灌注导管连接,尾III灌注导管、尾II灌注导管以及尾I灌注导管上安装有若干套压力检测系统,导管支撑及动力系统以及压力检测系统分别与控制系统电连接。
Pile foundation intelligent perfusion device and construction method
一种桩基智能灌注装置及施工方法
TANG ZHIHUA (Autor:in) / GUO WENJUN (Autor:in)
21.04.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2015
|Pile foundation construction platform and pile foundation construction method
Europäisches Patentamt | 2020
|PILE FOUNDATION AND PILE FOUNDATION CONSTRUCTION METHOD
Europäisches Patentamt | 2016
|Pile foundation construction platform and pile foundation construction method
Europäisches Patentamt | 2023
|Pile foundation construction platform and pile foundation construction method
Europäisches Patentamt | 2024
|