Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile leg pile shoe and pile pulling method of marine platform
The embodiment of the invention discloses a pile leg pile shoe and a pile pulling method of a marine platform. The pile leg pile shoe comprises a shell, a rotating mechanism and a plugging assembly. The pile pulling method comprises the steps that the rotating mechanism is rotated; sediment in a through hole extrudes a mounting plate to move downwards to a low position; a whipping assembly is rotated; and the pile leg pile shoe is integrally lifted. According to the pile leg pile shoe, the plugging assembly is arranged at the bottom, the insertion stability is effectively improved, the problemof slipping is greatly avoided, and the whipping assembly is further arranged, in the pile pulling process, a downward pushing force is applied to the mounting plate through sediment accumulated in the through hole located above the rotating mechanism, so that the mounting plate can move downwards, and then the whipping assembly is close to the plugging assembly and whipped, a seabed of the plugging assembly is soft, and effective pile pulling is achieved without the aid of external equipment.
本发明实施例公开了一种桩腿桩靴及海工平台的拔桩方法,桩腿桩靴包括壳体,转动机构,以及插拔组件。拔桩方法包括:转动转动机构;通孔中的泥沙挤压安装板向下移动至低位;转动搅打组件;对桩腿桩靴进行整体起吊。本发明通过在底部设置插拔组件,有效提高插入的稳固性,大大避免出现打滑的问题,进一步设置搅打组件,在拔桩过程中,通过位于转动机构上方的通孔中积聚的泥沙对安装板施加向下的推力,使得其能够向下移动,并进而使得搅打组件靠近插拔组件并实现搅打,使得插拔组件的海床松软,从而在不借助外部设备的前提下实现有效拔桩。
Pile leg pile shoe and pile pulling method of marine platform
The embodiment of the invention discloses a pile leg pile shoe and a pile pulling method of a marine platform. The pile leg pile shoe comprises a shell, a rotating mechanism and a plugging assembly. The pile pulling method comprises the steps that the rotating mechanism is rotated; sediment in a through hole extrudes a mounting plate to move downwards to a low position; a whipping assembly is rotated; and the pile leg pile shoe is integrally lifted. According to the pile leg pile shoe, the plugging assembly is arranged at the bottom, the insertion stability is effectively improved, the problemof slipping is greatly avoided, and the whipping assembly is further arranged, in the pile pulling process, a downward pushing force is applied to the mounting plate through sediment accumulated in the through hole located above the rotating mechanism, so that the mounting plate can move downwards, and then the whipping assembly is close to the plugging assembly and whipped, a seabed of the plugging assembly is soft, and effective pile pulling is achieved without the aid of external equipment.
本发明实施例公开了一种桩腿桩靴及海工平台的拔桩方法,桩腿桩靴包括壳体,转动机构,以及插拔组件。拔桩方法包括:转动转动机构;通孔中的泥沙挤压安装板向下移动至低位;转动搅打组件;对桩腿桩靴进行整体起吊。本发明通过在底部设置插拔组件,有效提高插入的稳固性,大大避免出现打滑的问题,进一步设置搅打组件,在拔桩过程中,通过位于转动机构上方的通孔中积聚的泥沙对安装板施加向下的推力,使得其能够向下移动,并进而使得搅打组件靠近插拔组件并实现搅打,使得插拔组件的海床松软,从而在不借助外部设备的前提下实现有效拔桩。
Pile leg pile shoe and pile pulling method of marine platform
一种桩腿桩靴及海工平台的拔桩方法
ZHU JUN (Autor:in) / WU SHUAIYU (Autor:in)
21.04.2020
Patent
Elektronische Ressource
Chinesisch
Suction type pile shoe, ocean platform and pile inserting and pulling method of ocean platform
Europäisches Patentamt | 2024
|OPERATION PLATFORM FOR PULLING PILES, PILE PULLING DEVICE AND PILE PULLING METHOD
Europäisches Patentamt | 2022
|