Passive type protecting device for water conservancy project slip-form construction and implementation method thereof
The invention relates to the field of water resource and hydropower, in particular to a passive type protecting device for water conservancy project slip-form construction and an implementation methodthereof. The protecting device comprises a concrete pouring platform arranged horizontally and two winding machines. Main steel ropes in the two winding machines are fixedly connected to the top of the concrete pouring platform. Installing frames, walking assemblies, pre-tightening assemblies, self-locking assemblies and locking reversing assemblies are arranged at the two ends of the concrete pouring platform correspondingly. Each walking assembly comprises a walking wheel. The outer edges of the walking wheels are attached to a slope of a dam body. The walking wheels are connected with theside wall of the sides, away from or close to the walking assemblies, of the installing frames in a rotating manner. The pre-tightening assemblies comprise pre-tightening steel ropes taken up or paidoff synchronously with the main steel ropes. According to the equipment, when the concrete pouring platform is lifted, the pre-tightening steel ropes can be lifted synchronously with the main steel ropes, after the main steel ropes are broken, the pre-tightening steel ropes can replace the main steel ropes to pull the concrete pouring platform, and therefore the situation that the concrete pouringplatform falls and personal casualties are caused can be prevented.
本发明涉及水利水电工程领域,具体是涉及一种水利工程滑模施工用被动式防护装置及其实施方法,包括有水平设置的混凝土浇筑平台和两组卷线机,两组卷线机内的主钢绳均于混凝土浇筑平台的顶部固定连接,混凝土浇筑平台的两端均设有安装架、行走组件、预紧组件、自锁组件和锁定换向组件,行走组件包括有行走轮,行走轮的外缘与坝体的斜坡面贴合,并且行走轮与安装架远离靠近行走组件一侧的侧壁可转动的连接,预紧组件包括有能够与主钢绳同步收放的预紧钢绳,本设备能够在混凝土浇筑平台升降时设有能够跟随主钢绳同步升降的预紧钢绳,在主钢绳发生断裂后,预紧钢绳能够替代主钢绳拉住混凝土浇筑平台,防止混凝土浇筑平台坠落造成人员伤亡。
Passive type protecting device for water conservancy project slip-form construction and implementation method thereof
The invention relates to the field of water resource and hydropower, in particular to a passive type protecting device for water conservancy project slip-form construction and an implementation methodthereof. The protecting device comprises a concrete pouring platform arranged horizontally and two winding machines. Main steel ropes in the two winding machines are fixedly connected to the top of the concrete pouring platform. Installing frames, walking assemblies, pre-tightening assemblies, self-locking assemblies and locking reversing assemblies are arranged at the two ends of the concrete pouring platform correspondingly. Each walking assembly comprises a walking wheel. The outer edges of the walking wheels are attached to a slope of a dam body. The walking wheels are connected with theside wall of the sides, away from or close to the walking assemblies, of the installing frames in a rotating manner. The pre-tightening assemblies comprise pre-tightening steel ropes taken up or paidoff synchronously with the main steel ropes. According to the equipment, when the concrete pouring platform is lifted, the pre-tightening steel ropes can be lifted synchronously with the main steel ropes, after the main steel ropes are broken, the pre-tightening steel ropes can replace the main steel ropes to pull the concrete pouring platform, and therefore the situation that the concrete pouringplatform falls and personal casualties are caused can be prevented.
本发明涉及水利水电工程领域,具体是涉及一种水利工程滑模施工用被动式防护装置及其实施方法,包括有水平设置的混凝土浇筑平台和两组卷线机,两组卷线机内的主钢绳均于混凝土浇筑平台的顶部固定连接,混凝土浇筑平台的两端均设有安装架、行走组件、预紧组件、自锁组件和锁定换向组件,行走组件包括有行走轮,行走轮的外缘与坝体的斜坡面贴合,并且行走轮与安装架远离靠近行走组件一侧的侧壁可转动的连接,预紧组件包括有能够与主钢绳同步收放的预紧钢绳,本设备能够在混凝土浇筑平台升降时设有能够跟随主钢绳同步升降的预紧钢绳,在主钢绳发生断裂后,预紧钢绳能够替代主钢绳拉住混凝土浇筑平台,防止混凝土浇筑平台坠落造成人员伤亡。
Passive type protecting device for water conservancy project slip-form construction and implementation method thereof
一种水利工程滑模施工用被动式防护装置及其实施方法
DING FENGJING (Autor:in)
21.04.2020
Patent
Elektronische Ressource
Chinesisch
Analog protection experiment device for slip-form construction of water conservancy project
Europäisches Patentamt | 2021
|Construction method of water conservancy project protecting slope supporting structure
Europäisches Patentamt | 2021
|Slip form for pouring panel for water conservancy construction and use method of slip form