The invention provides a construction method for a high-pressure jet grouting pile water stop curtain. The construction method comprises the following steps that S1, ground treatment is performed; S2,surveying and setting out are performed; S3, a drilling machine is in place; S4, the operation of drilling to the design depth is performed; S5, high-pressure jet grouting is performed; S6, the drilling machine is shifted; and S7, formed pile detection is performed. The construction method has the beneficial effects that a two-time construction pile-forming method is adopted, spraying of a clay layer is performed firstly, after the clay layer tends to be stable, high-pressure jet grouting pile operation is performed, so that the situation that concrete is corroded because of being in direct contact with underground water is prevented, and the anti-permeation effect is achieved at the same time.
本发明提供了高压旋喷桩止水帷幕施工方法,包括以下步骤,S1地面处理;S2测量放样;S3钻机就位;S4钻进设计深度;S5高压喷射注浆;S6钻机移位;S7成桩检测;本发明的有益效果:采用二次施打成桩方法,先喷射黏土层,待黏土层趋于稳定后再进行高压旋喷桩,防止混凝土与地下水直接接触而受到腐蚀并同时起到抗渗透作用。
The invention provides a construction method for a high-pressure jet grouting pile water stop curtain. The construction method comprises the following steps that S1, ground treatment is performed; S2,surveying and setting out are performed; S3, a drilling machine is in place; S4, the operation of drilling to the design depth is performed; S5, high-pressure jet grouting is performed; S6, the drilling machine is shifted; and S7, formed pile detection is performed. The construction method has the beneficial effects that a two-time construction pile-forming method is adopted, spraying of a clay layer is performed firstly, after the clay layer tends to be stable, high-pressure jet grouting pile operation is performed, so that the situation that concrete is corroded because of being in direct contact with underground water is prevented, and the anti-permeation effect is achieved at the same time.
本发明提供了高压旋喷桩止水帷幕施工方法,包括以下步骤,S1地面处理;S2测量放样;S3钻机就位;S4钻进设计深度;S5高压喷射注浆;S6钻机移位;S7成桩检测;本发明的有益效果:采用二次施打成桩方法,先喷射黏土层,待黏土层趋于稳定后再进行高压旋喷桩,防止混凝土与地下水直接接触而受到腐蚀并同时起到抗渗透作用。
Construction method for high-pressure jet grouting pile water stop curtain
高压旋喷桩止水帷幕施工方法
ZHOU LONG (Autor:in)
21.04.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
High-pressure jet grouting pile waterproof curtain construction method
Europäisches Patentamt | 2022
|Jet grouting pile for in-pit composite water stop and curtain construction method
Europäisches Patentamt | 2021
|High-pressure jet grouting pile waterproof curtain construction device
Europäisches Patentamt | 2024
|High pressure jet grouting pile waterproof curtain construction device and method
Europäisches Patentamt | 2015
|High-pressure jet grouting pile waterproof curtain open caisson construction method
Europäisches Patentamt | 2020
|