The invention relates to a laying construction method for building ground decorative floor tiles. The laying construction method comprises the following steps: paving preparation, horizontal line griddivision, preparation of cement slurry, cement slurry trowelling, tile pasting operation, seam filling operation and the like; and a cement paste trowelling device comprises a bottom plate, a liftingdevice, a vibration device and a flattening device. The laying construction method can solve the following problems when existing cement paste is smeared: a, in a traditional cement paste flatteningmode, the cement slurry is flattened by a flattening plate, the paving flattening effect is not good, a cement slurry layer can be laid flat repeatedly, and when reciprocating and trowelling are performed, the cement slurry layer is easily caused to be lower than the normal thickness, the floor tile laying down is caused; and b, because the labor intensity borne by workers is also large when the cement slurry is used for trowelling, and especially the use of the arm and waist strength of the workers is particularly frequent, and the workers have to take a rest after working for a while, the laying efficiency of the floor tiles is obviously reduced.
本发明涉及一种建筑地面装饰地板砖铺设施工方法,主要包括以下步骤,铺设准备、水平线分格、制备水泥浆、水泥浆抹平、贴砖作业以及填缝作业等多种工序,水泥浆抹平设备包括底板、升降装置、震动装置和铺平装置,本发明可以解决现有水泥浆抹平时存在的以下难题,a,传统的水泥浆摊平方式是借助于摊平板来对水泥浆进行摊平的,但是摊平板摊平的效果并不好,需要往复进行多次才能将水泥浆层铺平,且往复平复时,很容易造成泥沙浆层低于正常厚度,造成地板砖铺设下陷;b,在水泥浆抹平时,工人师傅所承受的劳动强度也较大,特别是对工人手臂及腰部力量的使用特别频繁,往往会导致工人师傅工作一会就必须休息一下,明显降低了地板砖的铺设效率。
The invention relates to a laying construction method for building ground decorative floor tiles. The laying construction method comprises the following steps: paving preparation, horizontal line griddivision, preparation of cement slurry, cement slurry trowelling, tile pasting operation, seam filling operation and the like; and a cement paste trowelling device comprises a bottom plate, a liftingdevice, a vibration device and a flattening device. The laying construction method can solve the following problems when existing cement paste is smeared: a, in a traditional cement paste flatteningmode, the cement slurry is flattened by a flattening plate, the paving flattening effect is not good, a cement slurry layer can be laid flat repeatedly, and when reciprocating and trowelling are performed, the cement slurry layer is easily caused to be lower than the normal thickness, the floor tile laying down is caused; and b, because the labor intensity borne by workers is also large when the cement slurry is used for trowelling, and especially the use of the arm and waist strength of the workers is particularly frequent, and the workers have to take a rest after working for a while, the laying efficiency of the floor tiles is obviously reduced.
本发明涉及一种建筑地面装饰地板砖铺设施工方法,主要包括以下步骤,铺设准备、水平线分格、制备水泥浆、水泥浆抹平、贴砖作业以及填缝作业等多种工序,水泥浆抹平设备包括底板、升降装置、震动装置和铺平装置,本发明可以解决现有水泥浆抹平时存在的以下难题,a,传统的水泥浆摊平方式是借助于摊平板来对水泥浆进行摊平的,但是摊平板摊平的效果并不好,需要往复进行多次才能将水泥浆层铺平,且往复平复时,很容易造成泥沙浆层低于正常厚度,造成地板砖铺设下陷;b,在水泥浆抹平时,工人师傅所承受的劳动强度也较大,特别是对工人手臂及腰部力量的使用特别频繁,往往会导致工人师傅工作一会就必须休息一下,明显降低了地板砖的铺设效率。
Laying construction method for building ground decorative floor tiles
一种建筑地面装饰地板砖铺设施工方法
21.04.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Mobile robot for laying floor tiles and method for laying floor tiles
Europäisches Patentamt | 2022
|Rapid laying structure of fabricated building floor tiles
Europäisches Patentamt | 2021
|Floor tile laying machine and method for laying floor tiles through machine