Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Flying saucer building steel beam installation structure and construction method thereof
The invention relates to the technical field of buildings, in particular to a flying saucer building steel beam installation structure which comprises a steel supporting column arranged on the ground,a steel structure flying saucer surface arranged on the supporting column, first connecting pieces arranged on the supporting column and located under the flying saucer surface, fixed columns arranged at one ends of the first connecting pieces and connected with the ground, first connecting assemblies arranged between the first connecting pieces and the fixed columns and playing a role in connecting, second connecting assemblies arranged on the first connecting pieces and connected with surrounding buildings, and buffering and fixing assemblies arranged between the first connecting pieces andthe supporting column and playing roles in buffering and connecting. The flying saucer building steel beam installation structure provided by the invention has the effects on shortening the construction duration of a flying saucer building and improving the stability of a flying saucer structure.
本发明涉及建筑的技术领域,尤其是涉及一种飞碟建筑钢梁安装结构,包括:设置在地面上的钢制承托柱;设置在承托柱上的钢结构飞碟面;设置在承托柱上且位于飞碟面下方的第一连接件;设置在第一连接件一端且与地面连接的固定柱;设置在第一连接件与固定柱之间的起到连接作用的第一连接组件;设置在第一连接件上且与周边建筑连接的第二连接组件;设置在第一连接件与承托柱之间起到缓冲、连接作用的缓冲固定组件。本发明具有缩短飞碟建筑的施工工期,且增加飞碟结构结构的稳定性的效果。
Flying saucer building steel beam installation structure and construction method thereof
The invention relates to the technical field of buildings, in particular to a flying saucer building steel beam installation structure which comprises a steel supporting column arranged on the ground,a steel structure flying saucer surface arranged on the supporting column, first connecting pieces arranged on the supporting column and located under the flying saucer surface, fixed columns arranged at one ends of the first connecting pieces and connected with the ground, first connecting assemblies arranged between the first connecting pieces and the fixed columns and playing a role in connecting, second connecting assemblies arranged on the first connecting pieces and connected with surrounding buildings, and buffering and fixing assemblies arranged between the first connecting pieces andthe supporting column and playing roles in buffering and connecting. The flying saucer building steel beam installation structure provided by the invention has the effects on shortening the construction duration of a flying saucer building and improving the stability of a flying saucer structure.
本发明涉及建筑的技术领域,尤其是涉及一种飞碟建筑钢梁安装结构,包括:设置在地面上的钢制承托柱;设置在承托柱上的钢结构飞碟面;设置在承托柱上且位于飞碟面下方的第一连接件;设置在第一连接件一端且与地面连接的固定柱;设置在第一连接件与固定柱之间的起到连接作用的第一连接组件;设置在第一连接件上且与周边建筑连接的第二连接组件;设置在第一连接件与承托柱之间起到缓冲、连接作用的缓冲固定组件。本发明具有缩短飞碟建筑的施工工期,且增加飞碟结构结构的稳定性的效果。
Flying saucer building steel beam installation structure and construction method thereof
一种飞碟建筑钢梁安装结构及其施工方法
LI YONGWEN (Autor:in) / HUANG SIDAO (Autor:in) / WEI XIAOSONG (Autor:in) / WAN XIA (Autor:in) / HE MINGJUN (Autor:in) / ZHENG YUEDONG (Autor:in)
28.04.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Steel beam rapid installation joint structure and construction method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|