Construction method of double-layer slag-proof floor drain
The invention discloses a construction method of a double-layer slag-proof floor drain. The double-layer slag-proof floor drain is obtained first, and comprises an upper floor drain and a lower floordrain arranged up and down, an arc-shaped arch cover is arranged below a surface cover of the upper floor drain, an adjustment stud is fixed on the lower surface of the surface cover, and passes through the arc-shaped arch cover, and an adjustment nut is arranged on the adjustment stud and is positioned below the arc-shaped arch cover in a thread fit manner. During the construction process, the arc-shaped arch cover is closed in an upper cup body to cover a pipe orifice of an upper water pipe, so as to avoid the falling of debris, and after the construction is completed, the arc-shaped arch cover is abutted on the surface cover by the adjustment nut, and the arc-shaped arch cover leaves the inner bottom surface of the upper cup body, so that normal drainage can be performed. The construction method is simple in construction operation and reliable in use.
本发明公开了一种双层防渣型地漏的施工方法,先获取双层防渣型地漏,包括上下设置的上层地漏和下层地漏,其中上层地漏的面盖下方设置有弧形拱盖,而面盖的下表面固定有调节螺柱,调节螺柱穿过弧形拱盖,调节螺柱上且位于弧形拱盖的下方位置螺纹配合有调节螺母。在施工过程中,利用弧形拱盖盖合在上杯体内对上水管的管口进行遮蔽,这样就能够避免渣石落入,而在施工完成后,利用调节螺母使弧形拱盖抵接在面盖上,使弧形拱盖离开上杯体的内底面,这样就能够进行正常排水。本发明施工操作简单,使用可靠。
Construction method of double-layer slag-proof floor drain
The invention discloses a construction method of a double-layer slag-proof floor drain. The double-layer slag-proof floor drain is obtained first, and comprises an upper floor drain and a lower floordrain arranged up and down, an arc-shaped arch cover is arranged below a surface cover of the upper floor drain, an adjustment stud is fixed on the lower surface of the surface cover, and passes through the arc-shaped arch cover, and an adjustment nut is arranged on the adjustment stud and is positioned below the arc-shaped arch cover in a thread fit manner. During the construction process, the arc-shaped arch cover is closed in an upper cup body to cover a pipe orifice of an upper water pipe, so as to avoid the falling of debris, and after the construction is completed, the arc-shaped arch cover is abutted on the surface cover by the adjustment nut, and the arc-shaped arch cover leaves the inner bottom surface of the upper cup body, so that normal drainage can be performed. The construction method is simple in construction operation and reliable in use.
本发明公开了一种双层防渣型地漏的施工方法,先获取双层防渣型地漏,包括上下设置的上层地漏和下层地漏,其中上层地漏的面盖下方设置有弧形拱盖,而面盖的下表面固定有调节螺柱,调节螺柱穿过弧形拱盖,调节螺柱上且位于弧形拱盖的下方位置螺纹配合有调节螺母。在施工过程中,利用弧形拱盖盖合在上杯体内对上水管的管口进行遮蔽,这样就能够避免渣石落入,而在施工完成后,利用调节螺母使弧形拱盖抵接在面盖上,使弧形拱盖离开上杯体的内底面,这样就能够进行正常排水。本发明施工操作简单,使用可靠。
Construction method of double-layer slag-proof floor drain
双层防渣型地漏的施工方法
TIAN YUEZENG (Autor:in) / HAN LIN (Autor:in)
08.05.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Multi-layer odor-resistant and overflow-proof clean floor drain
Europäisches Patentamt | 2024
|