Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of outer-hanging metal rock wool sandwich panel of autoclaved sand aerated concrete wall panel
The invention discloses a construction method of an outer-hanging metal rock wool sandwich panel of an autoclaved sand aerated concrete wall panel. The construction method is conducted after the completion of the steel structure construction and comprises the following steps that positioning and setting out of a steel structure are conducted, a steel ring beam is mounted on the steel structure, and a parapet column is mounted after the completion of the steel ring beam; and an ALC panel is mounted in the steel ring beam, correcting and fixing are conducted, after qualified mounting, cleaning,sweeping and coating of the ALC panel, cement mortar embedding is conducted, filling of a joint pointing agent is conducted, putty construction is conducted, the metal rock wool sandwich panel is mounted on the outer layer of the mounted ALC panel, L-shaped angle steel is adopted to be connected with the steel ring beam, and finally, an edge closing panel is mounted. By means of the construction method, the project manufacturing costs can be reduced, the construction period is shortened, and the construction safety factor is improved.
本发明公开了一种蒸压砂加气砼墙板外挂金属岩棉夹芯板施工方法,在钢结构施工完成后进行,包括以下步骤:对钢结构进行定位放线,钢结构上安装钢圈梁,钢圈梁全部安装完成后安装女儿墙立柱;在钢圈梁内安装ALC板,校正、固定,ALC板安装合格并清扫涂抹后,水泥砂浆嵌入,勾缝剂填补;腻子施工;在安装好的ALC板外层安装金属岩棉夹芯板,采用L型角钢与钢圈梁连接,最后安装收边板;该方法能够降低工程造价、缩短施工工期、提高施工安全系数。
Construction method of outer-hanging metal rock wool sandwich panel of autoclaved sand aerated concrete wall panel
The invention discloses a construction method of an outer-hanging metal rock wool sandwich panel of an autoclaved sand aerated concrete wall panel. The construction method is conducted after the completion of the steel structure construction and comprises the following steps that positioning and setting out of a steel structure are conducted, a steel ring beam is mounted on the steel structure, and a parapet column is mounted after the completion of the steel ring beam; and an ALC panel is mounted in the steel ring beam, correcting and fixing are conducted, after qualified mounting, cleaning,sweeping and coating of the ALC panel, cement mortar embedding is conducted, filling of a joint pointing agent is conducted, putty construction is conducted, the metal rock wool sandwich panel is mounted on the outer layer of the mounted ALC panel, L-shaped angle steel is adopted to be connected with the steel ring beam, and finally, an edge closing panel is mounted. By means of the construction method, the project manufacturing costs can be reduced, the construction period is shortened, and the construction safety factor is improved.
本发明公开了一种蒸压砂加气砼墙板外挂金属岩棉夹芯板施工方法,在钢结构施工完成后进行,包括以下步骤:对钢结构进行定位放线,钢结构上安装钢圈梁,钢圈梁全部安装完成后安装女儿墙立柱;在钢圈梁内安装ALC板,校正、固定,ALC板安装合格并清扫涂抹后,水泥砂浆嵌入,勾缝剂填补;腻子施工;在安装好的ALC板外层安装金属岩棉夹芯板,采用L型角钢与钢圈梁连接,最后安装收边板;该方法能够降低工程造价、缩短施工工期、提高施工安全系数。
Construction method of outer-hanging metal rock wool sandwich panel of autoclaved sand aerated concrete wall panel
一种蒸压砂加气砼墙板外挂金属岩棉夹芯板施工方法
MIAO JUNPING (Autor:in) / CAO TAIRAN (Autor:in) / FAN WEI (Autor:in) / WANG PING (Autor:in) / QIAN QIMIN (Autor:in) / ZHANG LIANG (Autor:in) / LIU SHAOJUN (Autor:in) / LIU CHUNHUI (Autor:in)
08.05.2020
Patent
Elektronische Ressource
Chinesisch
Autoclaved aerated concrete external wall panel and coating method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Autoclaved lightweight aerated concrete slab outer wall structure
Europäisches Patentamt | 2024
|Autoclaved lightweight aerated concrete slab outer wall structure
Europäisches Patentamt | 2022
|