Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Advance paying-off confirmation method for building construction
The invention relates to an advance paying-off confirmation method for building construction. The advance paying-off confirmation method for building construction comprise the following steps of: engraving a spray-painting identification panel in advance; checking the flatness of the wall surface, the ground and the top surface; uniformly brushing white wall protection layers on the wall surface,the ground and the top surface; marking three reference lines in each construction area according to the general plan; setting a finished surface control line, a wall surface finished line, a placement top surface finished line and a ground plus/minus 0.00 horizontal line; and setting three-dimensional modeling wireframes of various components, furniture, household appliances and hardware sanitaryappliances. The advance paying-off confirmation method can allow a customer to intuitively understand the decoration effect of drawings after the drawings are combined; by observing the relative position between the three-dimensional modeling wireframes, when the superposition occurs, the deviation possibly appears in the drawings; the advance paying-off confirmation method achieves the effects of guiding building construction and inspecting the correctness and rationality of the drawings, can allow the customer to intuitively understand the overall effect after construction, and effectivelyreduces the reworking rate of later reworking.
本发明涉及一种建筑施工预放线确认方法,其包括以下步骤:预先刻制喷绘标识面板;检查墙面、地面和顶面的平整性;对墙面、地面和顶面进行均匀涂刷白色的壁保层;根据总平面图在各个施工区域标识出三根基准线;设置完成面控制线、墙面完成线、放置顶面完成线和地面±0.00水平线;设置各个部件、家具、家电和五金洁具的三维造型线框。本发明能够让客户直观的了解到图纸的图纸组合后的装修效果,并且可以通过观察三维造型线框之间的相对位置,当发生重合时即可能图纸出现了偏差,达到了指导建筑施工,检验图纸正确性和合理性的的效果,并且能够让客户直观了解到施工后的整体效果,有效减少后期返工的返工率。
Advance paying-off confirmation method for building construction
The invention relates to an advance paying-off confirmation method for building construction. The advance paying-off confirmation method for building construction comprise the following steps of: engraving a spray-painting identification panel in advance; checking the flatness of the wall surface, the ground and the top surface; uniformly brushing white wall protection layers on the wall surface,the ground and the top surface; marking three reference lines in each construction area according to the general plan; setting a finished surface control line, a wall surface finished line, a placement top surface finished line and a ground plus/minus 0.00 horizontal line; and setting three-dimensional modeling wireframes of various components, furniture, household appliances and hardware sanitaryappliances. The advance paying-off confirmation method can allow a customer to intuitively understand the decoration effect of drawings after the drawings are combined; by observing the relative position between the three-dimensional modeling wireframes, when the superposition occurs, the deviation possibly appears in the drawings; the advance paying-off confirmation method achieves the effects of guiding building construction and inspecting the correctness and rationality of the drawings, can allow the customer to intuitively understand the overall effect after construction, and effectivelyreduces the reworking rate of later reworking.
本发明涉及一种建筑施工预放线确认方法,其包括以下步骤:预先刻制喷绘标识面板;检查墙面、地面和顶面的平整性;对墙面、地面和顶面进行均匀涂刷白色的壁保层;根据总平面图在各个施工区域标识出三根基准线;设置完成面控制线、墙面完成线、放置顶面完成线和地面±0.00水平线;设置各个部件、家具、家电和五金洁具的三维造型线框。本发明能够让客户直观的了解到图纸的图纸组合后的装修效果,并且可以通过观察三维造型线框之间的相对位置,当发生重合时即可能图纸出现了偏差,达到了指导建筑施工,检验图纸正确性和合理性的的效果,并且能够让客户直观了解到施工后的整体效果,有效减少后期返工的返工率。
Advance paying-off confirmation method for building construction
一种建筑施工预放线确认方法
WEI MEIRONG (Autor:in)
08.05.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building paying-off operation robot, paying-off ink jet system and paying-off method
Europäisches Patentamt | 2023
|Horizontal adsorption type building construction paying-off auxiliary laser equipment
Europäisches Patentamt | 2020
|Ash spreading and paying-off cart for building engineering construction
Europäisches Patentamt | 2020
|