Joint filling and beautifying integrated building decoration construction method after ground floor tile paving
The invention relates to a joint filling and beautifying integrated building decoration construction method after ground floor tile paving. The method mainly comprises the following steps that equipment is inspected, cement and a joint beautifying agent are placed, a treating device is adjusted, and joint filling and beautifying are carried out on floor tiles; and the method uses a joint filling and beautifying integrated construction device after ground floor tile paving, and the joint filling and beautifying integrated construction device after ground floor tile paving comprises a machine body, a driving device and the treating device. The joint filling and beautifying integrated building decoration construction method after ground floor tile paving can solve the problems that for jointfilling and beautifying of the floor tiles at present, joints of the floor tiles are generally filled with the cement and the joint beautifying agent, the operation process is many and the difficultyis high in the operation process, most of joint filling and beautifying of the floor tile joints are manually completed, workers need to bend down all the time in the process of completing the joint filling and beautifying work, the working efficiency is not high, and a large amount of manual labor is caused.
本发明涉及一种地面地砖铺装后填缝美缝一体化建筑装饰施工方法,主要包括以下步骤,设备检查、放入水泥和美缝剂、调节处理装置以及对地砖缝进行填缝美缝,其使用了一种地面地砖铺装后填缝美缝一体化施工装置,该一种地面地砖铺装后填缝美缝一体化施工装置包括机体、驱动装置与处理装置。本发明可以解决当下地砖填缝美缝一般是通过向地砖缝隙内填充水泥和美缝剂,操作过程存在工序多且难度大,对于地砖缝的填缝美缝大多数都是由人工完成的,工人在完成这些工作的过程中需要一直弯腰进行,而且工作效率不高,造成了大量的人工劳动。
Joint filling and beautifying integrated building decoration construction method after ground floor tile paving
The invention relates to a joint filling and beautifying integrated building decoration construction method after ground floor tile paving. The method mainly comprises the following steps that equipment is inspected, cement and a joint beautifying agent are placed, a treating device is adjusted, and joint filling and beautifying are carried out on floor tiles; and the method uses a joint filling and beautifying integrated construction device after ground floor tile paving, and the joint filling and beautifying integrated construction device after ground floor tile paving comprises a machine body, a driving device and the treating device. The joint filling and beautifying integrated building decoration construction method after ground floor tile paving can solve the problems that for jointfilling and beautifying of the floor tiles at present, joints of the floor tiles are generally filled with the cement and the joint beautifying agent, the operation process is many and the difficultyis high in the operation process, most of joint filling and beautifying of the floor tile joints are manually completed, workers need to bend down all the time in the process of completing the joint filling and beautifying work, the working efficiency is not high, and a large amount of manual labor is caused.
本发明涉及一种地面地砖铺装后填缝美缝一体化建筑装饰施工方法,主要包括以下步骤,设备检查、放入水泥和美缝剂、调节处理装置以及对地砖缝进行填缝美缝,其使用了一种地面地砖铺装后填缝美缝一体化施工装置,该一种地面地砖铺装后填缝美缝一体化施工装置包括机体、驱动装置与处理装置。本发明可以解决当下地砖填缝美缝一般是通过向地砖缝隙内填充水泥和美缝剂,操作过程存在工序多且难度大,对于地砖缝的填缝美缝大多数都是由人工完成的,工人在完成这些工作的过程中需要一直弯腰进行,而且工作效率不高,造成了大量的人工劳动。
Joint filling and beautifying integrated building decoration construction method after ground floor tile paving
一种地面地砖铺装后填缝美缝一体化建筑装饰施工方法
JIANG CHANGJUN (Autor:in) / ZHANG MEI (Autor:in)
15.05.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Automatic joint filling and beautifying equipment for building construction after laying floor tile
Europäisches Patentamt | 2021
|Floor tile seam beautifying auxiliary device for building decoration
Europäisches Patentamt | 2022
|Indoor floor decoration ceramic tile paving construction process
Europäisches Patentamt | 2020
|Tile paving construction process for indoor floor decoration
Europäisches Patentamt | 2023
|Indoor floor decoration ceramic tile paving construction process
Europäisches Patentamt | 2022
|