Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Settlement control device, bridge abutment structure and construction method of bridge abutment structure
The invention discloses a settlement control device, a bridge abutment structure and a construction method of the bridge abutment structure. The design thought is scientific and reasonable, and used materials are safe, reliable and good in durability. The construction method is convenient and fast to implement. Differential settlement of the two sides of the bridge abutment can be remarkably controlled, and differential settlement of the two sides of the bridge abutment can be eliminated theoretically. The phenomenon of bumping at the bridge head is prevented, driving jolt is reduced to the maximum extent, and the driving comfort is improved. Meanwhile, the use safety and durability of the bridge can be improved, and the maintenance cost of the bridge in the operation process is reduced.
本申请的一种沉降控制装置及桥台结构及桥台结构的施工方法,其设计思路科学合理,所用材料安全可靠、耐久性好,施工方法方便快捷,可显著的控制桥台两侧的差异沉降,理论上可以消除两者的不均匀沉降,防止桥头跳车现象的发生,最大程度地减小行车的颠簸,提高驾车的舒适性,同时可以提高桥梁使用的安全性和耐久性,减小运营过程中桥梁的维修成本。
Settlement control device, bridge abutment structure and construction method of bridge abutment structure
The invention discloses a settlement control device, a bridge abutment structure and a construction method of the bridge abutment structure. The design thought is scientific and reasonable, and used materials are safe, reliable and good in durability. The construction method is convenient and fast to implement. Differential settlement of the two sides of the bridge abutment can be remarkably controlled, and differential settlement of the two sides of the bridge abutment can be eliminated theoretically. The phenomenon of bumping at the bridge head is prevented, driving jolt is reduced to the maximum extent, and the driving comfort is improved. Meanwhile, the use safety and durability of the bridge can be improved, and the maintenance cost of the bridge in the operation process is reduced.
本申请的一种沉降控制装置及桥台结构及桥台结构的施工方法,其设计思路科学合理,所用材料安全可靠、耐久性好,施工方法方便快捷,可显著的控制桥台两侧的差异沉降,理论上可以消除两者的不均匀沉降,防止桥头跳车现象的发生,最大程度地减小行车的颠簸,提高驾车的舒适性,同时可以提高桥梁使用的安全性和耐久性,减小运营过程中桥梁的维修成本。
Settlement control device, bridge abutment structure and construction method of bridge abutment structure
一种沉降控制装置及桥台结构及桥台结构的施工方法
ZHENG XUENAN (Autor:in) / SHI PEIXIN (Autor:in) / YANG YANG (Autor:in) / TANG QIANG (Autor:in) / ZHONG BANGYAO (Autor:in) / JU JUN (Autor:in) / YU CHONGQING (Autor:in) / QU WEI (Autor:in) / LIU JUFU (Autor:in) / WANG PANFENG (Autor:in)
22.05.2020
Patent
Elektronische Ressource
Chinesisch
Novel bridge abutment structure and construction technology of bridge abutment
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Bridge abutment and bridge abutment design and construction method
Europäisches Patentamt | 2021
|