Railway reinforced roadbed and railway settlement roadbed reinforcing method
The invention provides a railway reinforced roadbed and a railway settlement roadbed reinforcing method. The railway reinforced roadbed comprises a roadbed body, a station track arranged on the roadbed body, a plurality of existing reinforcing piles, a plurality of cloth bag grouting piles and a first grouting pipe, at least part of the cloth bag grouting piles are arranged at the arrival and departure line of the station track, and the cloth bag grouting piles and the existing reinforcing piles are arranged in a staggered mode; first grouting pipes are arranged on the two sides of the cloth bag grouting pile, and one end of each first grouting pipe is inserted into a packing layer in the roadbed body. According to the railway reinforced roadbed, the cloth bag grouting piles are arranged at the station tracks to renovate a settlement roadbed of a railway, the reinforcing effect is good, pile position arrangement is flexible, and used construction mechanical equipment is small; and first grouting pipes are arranged on the two sides of the cloth bag grouting pile correspondingly, and grouting is conducted on the first grouting pipes to reinforce the packing layer of the nearby roadbed body after the cloth bag grouting pile is buried.
本发明提供了一种铁路加固路基及铁路沉降路基的加固方法,铁路加固路基包括路基本体、设置于路基本体上的股道、多个既有加固桩、多个布袋注浆桩以及第一注浆管,至少部分布袋注浆桩设置于股道的到发线处,布袋注浆桩与既有加固桩错开布设;布袋注浆桩的两侧设置有第一注浆管,第一注浆管的一端插入至路基本体中的填料层中。该铁路加固路基通过在股道处设置布袋注浆桩,对铁路的沉降路基进行整治,加固效果好,桩位布置灵活,所用施工机械设备小;并分别在布袋注浆桩的两侧设置第一注浆管,通过向第一注浆管注浆来加固埋设布袋注浆桩后附近路基本体的填料层。
Railway reinforced roadbed and railway settlement roadbed reinforcing method
The invention provides a railway reinforced roadbed and a railway settlement roadbed reinforcing method. The railway reinforced roadbed comprises a roadbed body, a station track arranged on the roadbed body, a plurality of existing reinforcing piles, a plurality of cloth bag grouting piles and a first grouting pipe, at least part of the cloth bag grouting piles are arranged at the arrival and departure line of the station track, and the cloth bag grouting piles and the existing reinforcing piles are arranged in a staggered mode; first grouting pipes are arranged on the two sides of the cloth bag grouting pile, and one end of each first grouting pipe is inserted into a packing layer in the roadbed body. According to the railway reinforced roadbed, the cloth bag grouting piles are arranged at the station tracks to renovate a settlement roadbed of a railway, the reinforcing effect is good, pile position arrangement is flexible, and used construction mechanical equipment is small; and first grouting pipes are arranged on the two sides of the cloth bag grouting pile correspondingly, and grouting is conducted on the first grouting pipes to reinforce the packing layer of the nearby roadbed body after the cloth bag grouting pile is buried.
本发明提供了一种铁路加固路基及铁路沉降路基的加固方法,铁路加固路基包括路基本体、设置于路基本体上的股道、多个既有加固桩、多个布袋注浆桩以及第一注浆管,至少部分布袋注浆桩设置于股道的到发线处,布袋注浆桩与既有加固桩错开布设;布袋注浆桩的两侧设置有第一注浆管,第一注浆管的一端插入至路基本体中的填料层中。该铁路加固路基通过在股道处设置布袋注浆桩,对铁路的沉降路基进行整治,加固效果好,桩位布置灵活,所用施工机械设备小;并分别在布袋注浆桩的两侧设置第一注浆管,通过向第一注浆管注浆来加固埋设布袋注浆桩后附近路基本体的填料层。
Railway reinforced roadbed and railway settlement roadbed reinforcing method
铁路加固路基及铁路沉降路基的加固方法
CHEN SHANGYONG (Autor:in) / XU YANHUA (Autor:in) / SUN HONGLIN (Autor:in) / GUO JIANHU (Autor:in) / LI SHILIANG (Autor:in) / XIONG LINDUN (Autor:in) / LU HAI (Autor:in) / WANG SHUYANG (Autor:in) / ZHU SHUNIAN (Autor:in)
05.06.2020
Patent
Elektronische Ressource
Chinesisch
High-speed railway roadbed settlement monitoring device
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|