The invention discloses a river channel revetment laying construction method for hydraulic engineering. The method comprises the following steps that 1, double-layer waterproof foundations are built on the two sides of a river channel slope surface; 2, mixed soil layers are laid on the double-layer waterproof foundations; 3, concrete anti-loss layers are poured at the bottoms of the double-layer waterproof foundations and the mixed soil layers; and 4, vegetation layers are laid on the mixed soil layers. According to the river channel revetment laying construction method for hydraulic engineering, the double-layer waterproof foundations, the mixed soil layers and the concrete anti-loss layers cooperate with the vegetation layers, and double-layer geotechnical cloth cooperates with water storage and drainage plates, so that redundant water is drained into a river channel on the premise that enough water in soil is guaranteed; and meanwhile, when little water is in the soil, the water storage and drainage plates can provide moisture, and water and soil conservation capacity of the soil is improved, so that hidden danger of water and soil loss caused by river impact and rain wash to arevetment is effectively reduced, simple construction process, short construction period and good protection effects on the river channel revetment are achieved, and river protection is facilitated.
本发明公开了一种水利工程用河道护坡铺设施工方法,包括以下步骤:步骤一、于河道坡面两侧建立双层防水地基;步骤二、于双层防水地基上铺设混合土层;步骤三、于双层防水地基和混合土层底部浇筑混凝土防流失层;步骤四、于混合土层上方铺设植被层;本发明采用双层防水地基、混合土层、混凝土防流失层配合植被层,双层土工布配合蓄排水板,能够在保证土壤内水分足够的前提下,将多余的水分排出至河道内,同时,在土壤内水分较少时,蓄排水板提供水分,增加土壤的水土保持能力,有效的减小了河流冲击、雨水冲刷对护坡所带来的水土流失隐患,施工工艺简单,工期短,对河道护坡的保护效果好,有利于对河道的保护。
River channel revetment laying construction method for hydraulic engineering
The invention discloses a river channel revetment laying construction method for hydraulic engineering. The method comprises the following steps that 1, double-layer waterproof foundations are built on the two sides of a river channel slope surface; 2, mixed soil layers are laid on the double-layer waterproof foundations; 3, concrete anti-loss layers are poured at the bottoms of the double-layer waterproof foundations and the mixed soil layers; and 4, vegetation layers are laid on the mixed soil layers. According to the river channel revetment laying construction method for hydraulic engineering, the double-layer waterproof foundations, the mixed soil layers and the concrete anti-loss layers cooperate with the vegetation layers, and double-layer geotechnical cloth cooperates with water storage and drainage plates, so that redundant water is drained into a river channel on the premise that enough water in soil is guaranteed; and meanwhile, when little water is in the soil, the water storage and drainage plates can provide moisture, and water and soil conservation capacity of the soil is improved, so that hidden danger of water and soil loss caused by river impact and rain wash to arevetment is effectively reduced, simple construction process, short construction period and good protection effects on the river channel revetment are achieved, and river protection is facilitated.
本发明公开了一种水利工程用河道护坡铺设施工方法,包括以下步骤:步骤一、于河道坡面两侧建立双层防水地基;步骤二、于双层防水地基上铺设混合土层;步骤三、于双层防水地基和混合土层底部浇筑混凝土防流失层;步骤四、于混合土层上方铺设植被层;本发明采用双层防水地基、混合土层、混凝土防流失层配合植被层,双层土工布配合蓄排水板,能够在保证土壤内水分足够的前提下,将多余的水分排出至河道内,同时,在土壤内水分较少时,蓄排水板提供水分,增加土壤的水土保持能力,有效的减小了河流冲击、雨水冲刷对护坡所带来的水土流失隐患,施工工艺简单,工期短,对河道护坡的保护效果好,有利于对河道的保护。
River channel revetment laying construction method for hydraulic engineering
一种水利工程用河道护坡铺设施工方法
ZHANG WENBIN (Autor:in) / XUE BAODONG (Autor:in) / MAO JIAPING (Autor:in) / GUAN HENG (Autor:in) / WU YULONG (Autor:in) / WANG BO (Autor:in) / JI KAI (Autor:in) / WANG CHUNFANG (Autor:in) / LIU YANG (Autor:in) / CHEN XIAOYAN (Autor:in)