Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a construction engineering prestressed concrete construction device. The construction engineering prestressed concrete construction device comprises a base table surface, wherein a left table seat is arranged at the left end of the top surface of the base table surface; a fixed end anchoring part is arranged on the left side surface of the left table seat; a right table seat is arranged at the right end of the top surface of the base table surface; the left end of a prestressed rib is fixed together with the left table seat through the cooperation of the fixed end anchoring part and a force rib connector; the right end of the prestressed rib is fixed together with the right table seat through the cooperation of an automatic locking device and the force rib connector; and the automatic locking device is in transmission connection with a movable cross beam through a limiting device. The connection mode is simple and convenient, special machining does not need to be carried out at the end part of the prestressed rib, the construction mode is simpler, and the construction cost is reduced; and the tensioned prestressed rib is automatically locked through the cooperation of the automatic locking device and the right table seat, manual operation is not needed, time and labor are saved, and the practicability of the construction engineering prestressed concreteconstruction device is improved.
本发明公开了一种建筑工程预应力混凝土施工装置,包括基台面,所述基台面顶面的左端设有左台座,左台座的左侧面上设有固定端锚固件,基台面顶面的右端设有右台座;通过固定端锚固件和力筋连接器的配合,使预应力筋的左端与左台座固定在一起,通过自动锁定器和力筋连接器的配合,使预应力筋的右端与右台座固定在一起,通过限位器,使自动锁定器与活动横梁传动连接,连接方式简单方便,不需要在预应力筋的端部进行特殊的加工,施工方式更为简单,施工成本降低,通过自动锁定器与右台座的配合自动对张拉后的预应力筋进行锁定,不需要人为操作,省时省力,提高了该建筑工程预应力混凝土施工装置的实用性。
The invention discloses a construction engineering prestressed concrete construction device. The construction engineering prestressed concrete construction device comprises a base table surface, wherein a left table seat is arranged at the left end of the top surface of the base table surface; a fixed end anchoring part is arranged on the left side surface of the left table seat; a right table seat is arranged at the right end of the top surface of the base table surface; the left end of a prestressed rib is fixed together with the left table seat through the cooperation of the fixed end anchoring part and a force rib connector; the right end of the prestressed rib is fixed together with the right table seat through the cooperation of an automatic locking device and the force rib connector; and the automatic locking device is in transmission connection with a movable cross beam through a limiting device. The connection mode is simple and convenient, special machining does not need to be carried out at the end part of the prestressed rib, the construction mode is simpler, and the construction cost is reduced; and the tensioned prestressed rib is automatically locked through the cooperation of the automatic locking device and the right table seat, manual operation is not needed, time and labor are saved, and the practicability of the construction engineering prestressed concreteconstruction device is improved.
本发明公开了一种建筑工程预应力混凝土施工装置,包括基台面,所述基台面顶面的左端设有左台座,左台座的左侧面上设有固定端锚固件,基台面顶面的右端设有右台座;通过固定端锚固件和力筋连接器的配合,使预应力筋的左端与左台座固定在一起,通过自动锁定器和力筋连接器的配合,使预应力筋的右端与右台座固定在一起,通过限位器,使自动锁定器与活动横梁传动连接,连接方式简单方便,不需要在预应力筋的端部进行特殊的加工,施工方式更为简单,施工成本降低,通过自动锁定器与右台座的配合自动对张拉后的预应力筋进行锁定,不需要人为操作,省时省力,提高了该建筑工程预应力混凝土施工装置的实用性。
Construction engineering prestressed concrete construction device
一种建筑工程预应力混凝土施工装置
LYU LU (Autor:in)
05.06.2020
Patent
Elektronische Ressource
Chinesisch
Prestressed concrete construction
Engineering Index Backfile | 1950
|Prestressed concrete construction
Engineering Index Backfile | 1951
|Prestressed concrete construction device and method for constructional engineering
Europäisches Patentamt | 2022
|Prestressed Concrete Pavement Construction
NTIS | 1973
|Concrete for prestressed concrete construction
Engineering Index Backfile | 1959
|