Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Energy-saving building wall heat preservation treatment construction process
The invention relates to an energy-saving building wall heat preservation treatment construction process. The energy-saving building wall heat preservation treatment construction process adopts the following building wall heat preservation treatment construction device, wherein the building wall heat preservation treatment construction device comprises a base, a movable column, a lifting frame, alimiting column, a flattening mechanism and a positioning branch chain; the process for carrying out heat preservation treatment construction on the building wall by adopting the building wall heat preservation treatment construction device comprises the following steps of S1, wall surface cleaning; S2, wall plastering; S3, placing the base; S4, pasting a rock wool board; S5, locking the rock woolboard; and S6, subsequent processing. The energy-saving building wall heat preservation treatment construction process can solve the problems that when the rock wool board is pasted, the pasting position of the rock wool board cannot be limited, so that the pasting effect of the rock wool board is poor; after the rock wool board is pasted, the rock wool board cannot be synchronously rolled and pasted, so that the problems of uneven rock wool layers and the like are caused.
本发明涉及一种节能建筑墙体保温处理施工工艺,该节能建筑墙体保温处理施工工艺采用如下建筑墙体保温处理施工装置,该建筑墙体保温处理施工装置包括底座、移动柱、升降架、限位柱、抚平机构和定位支链;采用上述建筑墙体保温处理施工装置对建筑墙体保温处理施工的工艺,包括以下步骤:S1、墙面清理;S2、墙面抹浆;S3、底座放置;S4、岩棉板贴装;S5、岩棉板锁定;S6、后续处理。本发明可以解决现有岩棉板进行贴装时存在的:岩棉板贴装时无法对其贴装位置进行限位,造成岩棉板的贴装效果差;岩棉板贴装后无法同步对其进行滚压贴实,从而造成岩棉层出现凹凸不平的现象等问题。
Energy-saving building wall heat preservation treatment construction process
The invention relates to an energy-saving building wall heat preservation treatment construction process. The energy-saving building wall heat preservation treatment construction process adopts the following building wall heat preservation treatment construction device, wherein the building wall heat preservation treatment construction device comprises a base, a movable column, a lifting frame, alimiting column, a flattening mechanism and a positioning branch chain; the process for carrying out heat preservation treatment construction on the building wall by adopting the building wall heat preservation treatment construction device comprises the following steps of S1, wall surface cleaning; S2, wall plastering; S3, placing the base; S4, pasting a rock wool board; S5, locking the rock woolboard; and S6, subsequent processing. The energy-saving building wall heat preservation treatment construction process can solve the problems that when the rock wool board is pasted, the pasting position of the rock wool board cannot be limited, so that the pasting effect of the rock wool board is poor; after the rock wool board is pasted, the rock wool board cannot be synchronously rolled and pasted, so that the problems of uneven rock wool layers and the like are caused.
本发明涉及一种节能建筑墙体保温处理施工工艺,该节能建筑墙体保温处理施工工艺采用如下建筑墙体保温处理施工装置,该建筑墙体保温处理施工装置包括底座、移动柱、升降架、限位柱、抚平机构和定位支链;采用上述建筑墙体保温处理施工装置对建筑墙体保温处理施工的工艺,包括以下步骤:S1、墙面清理;S2、墙面抹浆;S3、底座放置;S4、岩棉板贴装;S5、岩棉板锁定;S6、后续处理。本发明可以解决现有岩棉板进行贴装时存在的:岩棉板贴装时无法对其贴装位置进行限位,造成岩棉板的贴装效果差;岩棉板贴装后无法同步对其进行滚压贴实,从而造成岩棉层出现凹凸不平的现象等问题。
Energy-saving building wall heat preservation treatment construction process
一种节能建筑墙体保温处理施工工艺
MAO PENGFEI (Autor:in)
09.06.2020
Patent
Elektronische Ressource
Chinesisch
Energy-saving building wall heat preservation treatment construction process
Europäisches Patentamt | 2021
|Fabricated building energy-saving heat preservation wall
Europäisches Patentamt | 2021
|Heat preservation type energy-saving building curtain wall
Europäisches Patentamt | 2024
|