Concrete pouring method for large-slope inclined plane
The invention belongs to the technical field of concrete engineering construction, and provides a concrete pouring method for a large-slope inclined plane. The method comprises the following steps that S1, protective formworks are raised, and parallel guide rails from the bottom to the top of the inclined plane are set up on two sides; S2, binding steel bars are laid according to requirements, cross beams capable of moving along the guide rails are installed on the guide rails, a vehicle frame capable of moving along the cross beams is installed, and a tamping rod is installed on the vehicle frame; S3, concrete is poured in sections from the bottom to the top of the inclined plane according to a set distance, the tamping rod is started for each pouring section, and after the previous section is tamped, the next section pouring is carried out after a set time; and S4, after the concrete solidification strength reaches the preset strength, the surface is brushed with a curing agent for maintenance until the concrete completely solidifies, and the formworks are removed. According to the method, the concrete is poured in sections from the bottom to the top of the inclined plane, the tamping rod can be randomly moved in the pouring range by moving the cross beam and the vehicle frame, and the compactness degree of pouring concrete on the large-slope inclined slope is guaranteed.
本发明属于混凝土工程施工技术领域,提供了一种大坡度斜面的混凝土浇筑方法,包括以下步骤:S100:支护模板,两侧架设斜面底部至顶部的平行导轨;S200:按要求铺设绑扎钢筋,在导轨上安装能够沿导轨移动的横梁,横梁上设置能够沿横梁移动的车架,车架上安装捣振棒;S300:按照设定距离分段由斜面底部向顶部浇筑混凝土,每浇筑一段都启动捣振棒进行捣实,在前一段捣实后,经过设定时间再进行下段浇筑;S400:混凝土凝固强度达到预设强度后,表面涂刷养护剂进行养护,至完全凝固拆除模板。该方法采取由斜面底部向顶部分段浇筑混凝土的方式,通过移动横梁和车架,可以在浇筑范围内任意移动捣振棒进行充分捣振,保证大坡度斜面浇筑混凝土的密实程度。
Concrete pouring method for large-slope inclined plane
The invention belongs to the technical field of concrete engineering construction, and provides a concrete pouring method for a large-slope inclined plane. The method comprises the following steps that S1, protective formworks are raised, and parallel guide rails from the bottom to the top of the inclined plane are set up on two sides; S2, binding steel bars are laid according to requirements, cross beams capable of moving along the guide rails are installed on the guide rails, a vehicle frame capable of moving along the cross beams is installed, and a tamping rod is installed on the vehicle frame; S3, concrete is poured in sections from the bottom to the top of the inclined plane according to a set distance, the tamping rod is started for each pouring section, and after the previous section is tamped, the next section pouring is carried out after a set time; and S4, after the concrete solidification strength reaches the preset strength, the surface is brushed with a curing agent for maintenance until the concrete completely solidifies, and the formworks are removed. According to the method, the concrete is poured in sections from the bottom to the top of the inclined plane, the tamping rod can be randomly moved in the pouring range by moving the cross beam and the vehicle frame, and the compactness degree of pouring concrete on the large-slope inclined slope is guaranteed.
本发明属于混凝土工程施工技术领域,提供了一种大坡度斜面的混凝土浇筑方法,包括以下步骤:S100:支护模板,两侧架设斜面底部至顶部的平行导轨;S200:按要求铺设绑扎钢筋,在导轨上安装能够沿导轨移动的横梁,横梁上设置能够沿横梁移动的车架,车架上安装捣振棒;S300:按照设定距离分段由斜面底部向顶部浇筑混凝土,每浇筑一段都启动捣振棒进行捣实,在前一段捣实后,经过设定时间再进行下段浇筑;S400:混凝土凝固强度达到预设强度后,表面涂刷养护剂进行养护,至完全凝固拆除模板。该方法采取由斜面底部向顶部分段浇筑混凝土的方式,通过移动横梁和车架,可以在浇筑范围内任意移动捣振棒进行充分捣振,保证大坡度斜面浇筑混凝土的密实程度。
Concrete pouring method for large-slope inclined plane
大坡度斜面的混凝土浇筑方法
HU PENGFEI (Autor:in) / WEI YUQIANG (Autor:in)
09.06.2020
Patent
Elektronische Ressource
Chinesisch
Concrete pouring construction method for span beam inclined plane structure
Europäisches Patentamt | 2021
|Fair-faced concrete inclined wall pouring device and pouring construction method
Europäisches Patentamt | 2023
|Large-slope inclined column concrete vibrating assisting method
Europäisches Patentamt | 2021
|